null
Showing 11 of 25 Products
Clear Active Filters

Add Your Own Logo

Only $9.95 Per Cart!

  • Personalise your documents for that professional look
  • Save time and money by letting us brand your documents for you

With this powerful tool, you can add your logo, business name, address, and ABN to all of the required fields within your documents for one low fee per cart—not per document. You will then receive your branded documents shortly after payment.

Our shop fit-out SWMS covers electrical hazards, silica dust, working at height, working with the public and more. They are easy to use and come in an editable format, so you can add your own company name and logo. You can even track when employees have read it by adding their names to the document.

 

With SafetyDocs SWMS, you get peace of mind that everyone is on the same page about safety procedures for every job site they visit. No matter what kind of shop fit-out project you have going on, we have something here for it. And with different templates available, there is sure to be one that fits your needs perfectly!

 

You can be confident knowing our team has over 15 years of experience in writing and editing safety documents for this industry, so don't waste hours trying to find information needed to create your own.

 

Construction worker in new-shop fitout work site | SafetyDocs

Our Safe Work Method Statements are not blank templates, they contain the most common hazards and controls measures to manage risk.

 

We can't see what's happening on your site though, it's vitally important you include site-specific hazards, assess the risk, and make our SWMS specific to your task at hand.

 

Safe Work Method Statements set out the work activities in logical sequences; identifies hazards and describes the corresponding control measures.

 

The content of a SWMS should be regularly reviewed and needs to include consultation with workers and other persons.

 

If you are changing sites or conducting a new activity, the SWMS content should be checked and amended to suit.

  • The name of the principal contractor test
  • Name, address and ABN
  • Details of the person responsible for ensuring monitoring and compliance with the SWMS
  • The date the SWMS was prepared and review dates
  • The signature of each worker
  • Identify the high-risk construction work
  • Specify hazards and risks relating to the work
  • Describe the control measures used to control identified risks
  • Describe how the control measures will be monitored and reviewed

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View

OHS/WHS Management Systems FAQ's. View

Quality Management System (QMS) FAQ's. View

New Zealand FAQ's. View

Custom Branding FAQ's. View