null

Sign Installation Safe Work Method Statement

Product SKU: 10447-3

Signs on a roller door.
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Signage Installation Safe Work Method Statement

This Signage Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with sign installation.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Asbestos disturbance
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Signage Installation SWMS:

(includes potential hazards & control measures)

  1. Working Outdoors
  2. Environment
  3. Housekeeping
  4. Manual Tasks
  5. Arrival On-site & Assess On-site Conditions
  6. Work Area Set-up
  7. Working with Powered & Non-powered Tools
  8. Hazardous Substance/Chemical Use
  9. Working at Height on Ladders, Trestles, Mobile Scaffold, Fixed Scaffold & Openings
  10. Removal/Replacement of Signs
  11. On Completion
  12. Emergency Response

View Document Sample

Write a Review
$89.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Signage Installation Safe Work Method Statement

    This Signage Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with sign installation.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Asbestos disturbance
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Involves a risk of a person falling from 2m or more, including work on telecommunications towers
    • Work in an area that may have a contaminated or flammable atmosphere

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Signage Installation SWMS:

    (includes potential hazards & control measures)

    1. Working Outdoors
    2. Environment
    3. Housekeeping
    4. Manual Tasks
    5. Arrival On-site & Assess On-site Conditions
    6. Work Area Set-up
    7. Working with Powered & Non-powered Tools
    8. Hazardous Substance/Chemical Use
    9. Working at Height on Ladders, Trestles, Mobile Scaffold, Fixed Scaffold & Openings
    10. Removal/Replacement of Signs
    11. On Completion
    12. Emergency Response

    View Document Sample

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials

You may also need