null

Aluminium Window Door Frame Installation Safe Work Method Statement

Product SKU: 10169-5

Man installing aluminium window door frame.
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Aluminium Window Door Frame Installation Safe Work Method Statement

This Aluminium Window Door Frame Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the handling, movement on site and installation of aluminium window and door frames.

This SWMS includes cutting and joining aluminium products and use of mastic sealants.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Aluminium Window Door Frame Installation SWMS: 

(includes potential hazards & control measures).

  1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
  2. Working Outdoors
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Materials Delivery
  9. Working with Powered & Non-powered Tools
  10. Hazardous Substance/Chemical Use
  11. Working at Height on Ladders, Trestles, Mobile Scaffold, Fixed Scaffold & Openings
  12. Cutting & Joining Aluminium
  13. Positioning, Levelling & Fixing Frames
  14. On Completion
  15. Emergency Response

View Document Sample

1 review Write a Review
$89.95
Custom branding available

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Aluminium Window Door Frame Installation Safe Work Method Statement

    This Aluminium Window Door Frame Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the handling, movement on site and installation of aluminium window and door frames.

    This SWMS includes cutting and joining aluminium products and use of mastic sealants.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Work in an area that may have a contaminated or flammable atmosphere

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Aluminium Window Door Frame Installation SWMS: 

    (includes potential hazards & control measures).

    1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
    2. Working Outdoors
    3. Arrival On-site & Assess On-site Conditions
    4. Work Area Set-up
    5. Environment
    6. Housekeeping
    7. Manual Tasks
    8. Materials Delivery
    9. Working with Powered & Non-powered Tools
    10. Hazardous Substance/Chemical Use
    11. Working at Height on Ladders, Trestles, Mobile Scaffold, Fixed Scaffold & Openings
    12. Cutting & Joining Aluminium
    13. Positioning, Levelling & Fixing Frames
    14. On Completion
    15. Emergency Response

    View Document Sample

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials
  • Reviews
  • 1 Review

    • 5

      SWMS Review

      Posted by Unknown on Feb 20th 2018

      I found this product to be excellent, made doing the SWMS a dream, instead of hard work. Thank you so much