Audio Visual Installation Safe Work Method Statement

This Audio Visual Installation Safe Work Method Statement covers hazards and controls associated with installation of audio visual equipment such as video conferencing, audio & PA systems, digital signage and home theatre systems.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Audio Visual Installation SWMS: 

(includes potential hazards & control measures).

  1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
  2. Planning
  3. Arrival On-site, Site Assessment & Unloading of Materials/Equipment
  4. Work Area Set-up
  5. Locate & Isolate Existing Services
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Working with Powered & Non-powered Tools
  10. Working at Height on Ladders, Trestles & Mobile Scaffold
  11. Working in Roof Space
  12. New Equipment (electrical testing)
  13. Running Cables/Setting-up Equipment
  14. Lifting, Mounting & Installing Components into Position
  15. Test & Commission
  16. On Completion
  17. Emergency Response
Write a Review
$89.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Audio Visual Installation Safe Work Method Statement

    This Audio Visual Installation Safe Work Method Statement covers hazards and controls associated with installation of audio visual equipment such as video conferencing, audio & PA systems, digital signage and home theatre systems.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Involves a risk of a person falling from 2m or more, including work on telecommunications towers
    • Work in an area that may have a contaminated or flammable atmosphere

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Audio Visual Installation SWMS: 

    (includes potential hazards & control measures).

    1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
    2. Planning
    3. Arrival On-site, Site Assessment & Unloading of Materials/Equipment
    4. Work Area Set-up
    5. Locate & Isolate Existing Services
    6. Environment
    7. Housekeeping
    8. Manual Tasks
    9. Working with Powered & Non-powered Tools
    10. Working at Height on Ladders, Trestles & Mobile Scaffold
    11. Working in Roof Space
    12. New Equipment (electrical testing)
    13. Running Cables/Setting-up Equipment
    14. Lifting, Mounting & Installing Components into Position
    15. Test & Commission
    16. On Completion
    17. Emergency Response