null

This Safe Work Month, buy any Management System and add 4 SWMS to your cart for FREE! Use code NSWM2023 at checkout. *T&C’s apply.

Two men in hardhats and high vis vests looking at documents

Site Establishment Shop Fit-out Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Site Establishment Shop Fit-out Safe Work Method Statement

This Site Establishment Shop Fit-out Safe Work Method Statement (SWMS) covers hazards and controls associated with site setup for commercial premises in preparation for a shop fit-out.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Site Establishment Shop Fit-out SWMS:

(includes potential hazards & control measures)

  1. Implement a Site Safety Management Plan
  2. Planning
  3. Arrival On-site & Assess On-site Conditions
  4. Site Establishment
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Working with Powered & Non-powered Tools
  9. On Completion
  10. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Site Establishment Shop Fit-out Safe Work Method Statement

This Site Establishment Shop Fit-out Safe Work Method Statement (SWMS) covers hazards and controls associated with site setup for commercial premises in preparation for a shop fit-out.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Site Establishment Shop Fit-out SWMS:

(includes potential hazards & control measures)

  1. Implement a Site Safety Management Plan
  2. Planning
  3. Arrival On-site & Assess On-site Conditions
  4. Site Establishment
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Working with Powered & Non-powered Tools
  9. On Completion
  10. Emergency Response
PDF Download
PDF File

You May Also Need

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View