Invest in Safety and Save This EOFY - Maximise your tax deductions with our range of HSEQ documents, tailored to your Industry. Shop our Industry Packages now and save.

Two men in hardhats and high vis vests looking at documents

Site Establishment Shop Fit-out Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Site Establishment Shop Fit-out Safe Work Method Statement

This Site Establishment Shop Fit-out Safe Work Method Statement (SWMS) covers hazards and controls associated with site setup for commercial premises in preparation for a shop fit-out.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Site Establishment Shop Fit-out SWMS:

(includes potential hazards & control measures)

  1. Implement a Site Safety Management Plan
  2. Planning
  3. Arrival On-site & Assess On-site Conditions
  4. Site Establishment
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Working with Powered & Non-powered Tools
  9. On Completion
  10. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Site Establishment Shop Fit-out Safe Work Method Statement

This Site Establishment Shop Fit-out Safe Work Method Statement (SWMS) covers hazards and controls associated with site setup for commercial premises in preparation for a shop fit-out.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Site Establishment Shop Fit-out SWMS:

(includes potential hazards & control measures)

  1. Implement a Site Safety Management Plan
  2. Planning
  3. Arrival On-site & Assess On-site Conditions
  4. Site Establishment
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Working with Powered & Non-powered Tools
  9. On Completion
  10. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View