null

Site Establishment Shop Fit-out Safe Work Method Statement

Product SKU: 10585-4

Two men in hardhats and high vis vests looking at documents
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Site Establishment Shop Fit-out Safe Work Method Statement

This Site Establishment Shop Fit-out Safe Work Method Statement (SWMS) covers hazards and controls associated with site setup for commercial premises in preparation for a shop fit-out.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Site Establishment Shop Fit-out SWMS:

(includes potential hazards & control measures)

  1. Implement a Site Safety Management Plan
  2. Planning
  3. Arrival On-site & Assess On-site Conditions
  4. Site Establishment
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Working with Powered & Non-powered Tools
  9. On Completion
  10. Emergency Response
Write a Review
$89.95
Custom branding available 76BAA198-9788-4A00-A3E8-BC847155F144
  • Personalise your documents with custom branding
  • Custom branding adds your business name, address, ABN and logo where required to the documents in your order
  • $9.95 per cart (no matter how many products are in your order)
  • Upload your details at cart
  • Receive your branded documents shortly after payment

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Site Establishment Shop Fit-out Safe Work Method Statement

    This Site Establishment Shop Fit-out Safe Work Method Statement (SWMS) covers hazards and controls associated with site setup for commercial premises in preparation for a shop fit-out.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Work in an area that may have a contaminated or flammable atmosphere

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Site Establishment Shop Fit-out SWMS:

    (includes potential hazards & control measures)

    1. Implement a Site Safety Management Plan
    2. Planning
    3. Arrival On-site & Assess On-site Conditions
    4. Site Establishment
    5. Environment
    6. Housekeeping
    7. Manual Tasks
    8. Working with Powered & Non-powered Tools
    9. On Completion
    10. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials