Temporary Structure Construction-Dismantle Safe Work Method Statement
This Temporary Structure Construction-Dismantle Safe Work Method Statement (SWMS) covers hazards and controls associated with erecting and dismantling temporary structures such as marquees, big tops, event booths etc.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Demolition of a load-bearing structure
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Involves a risk of a person falling from 2m or more, including work on telecommunications towers
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Silica Dust & Environmental Considerations.
Job Steps Covered in Temporary Structure Construction-Dismantle SWMS:
(includes potential hazards & control measures).
- Planning
- Working Outdoors
- Arrival On-site, Site Assessment & Unloading of Materials/Equipment
- Work Area Set-up
- Mobile Plant Operation (e.g. forklift, telehandler)
- Environment
- Locate & Isolate Existing Services
- Erecting Structure
- Rigging & Dogging
- Working Near Powered Mobile Plant (e.g. forklifts, telehandlers)
- Working at Height on Ladders, Trestles & Mobile Scaffold
- Dismantling (breakdown structure)
- On Completion
- Emergency Response
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Temporary Structure Construction-Dismantle Safe Work Method Statement
This Temporary Structure Construction-Dismantle Safe Work Method Statement (SWMS) covers hazards and controls associated with erecting and dismantling temporary structures such as marquees, big tops, event booths etc.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Demolition of a load-bearing structure
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Involves a risk of a person falling from 2m or more, including work on telecommunications towers
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Silica Dust & Environmental Considerations.
Job Steps Covered in Temporary Structure Construction-Dismantle SWMS:
(includes potential hazards & control measures).
- Planning
- Working Outdoors
- Arrival On-site, Site Assessment & Unloading of Materials/Equipment
- Work Area Set-up
- Mobile Plant Operation (e.g. forklift, telehandler)
- Environment
- Locate & Isolate Existing Services
- Erecting Structure
- Rigging & Dogging
- Working Near Powered Mobile Plant (e.g. forklifts, telehandlers)
- Working at Height on Ladders, Trestles & Mobile Scaffold
- Dismantling (breakdown structure)
- On Completion
- Emergency Response