null

Get 20% off all documents this World Day for Safety and Health at Work. Use code SAFETY2023 at checkout. TODAY ONLY!*.

Transform your workplace with our NEW Psychosocial Hazard Management Plan. Find out more here.

Gloves and rigging

Dogging Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Dogman Safe Work Method Statement

This Dogman Safe Work Method Statement (SWMS) covers hazards and controls associated with rigging and dogging work relating to the slinging, direction and movement of loads.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement

Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps covered in Dogman SWMS: 

 (includes potential hazards and control measures)

  1. Working Outdoors
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Select & Inspect Equipment
  8. Conduct a Pre-lift Assessment
  9. Dogging Task
  10. Working near Overhead Electric Lines
  11. On Completion
  12. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Dogman Safe Work Method Statement

This Dogman Safe Work Method Statement (SWMS) covers hazards and controls associated with rigging and dogging work relating to the slinging, direction and movement of loads.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement

Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps covered in Dogman SWMS: 

 (includes potential hazards and control measures)

  1. Working Outdoors
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Select & Inspect Equipment
  8. Conduct a Pre-lift Assessment
  9. Dogging Task
  10. Working near Overhead Electric Lines
  11. On Completion
  12. Emergency Response
PDF Download
PDF File

You May Also Need

Hear From Our Customers

  • 4

    Good product

    Good product

  • 5

    Thorough, correct, east-to-use, great legislative reference attachments and easy to re-badge.

    Thorough, correct, east-to-use, great legislative reference attachments and easy to re-badge.

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View