null

Civil Road Base and Seal Safe Work Method Statement

Product SKU: 10443-3

Civil Road Base and Seal Work being conducted
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Civil Road Base and Seal Safe Work Method Statement

This Civil Road Base and Seal Safe Work Method Statement (SWMS) covers hazards and controls associated with roadbase installation.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Job Steps Covered in Civil Road Base and Seal SWMS:

(includes potential hazards & control measures)

  1. Training
  2. Planning
  3. Working Outdoors
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Delivery, Set-up & Removal of Machinery
  7. Environment
  8. Housekeeping
  9. Manual Tasks
  10. Working Adjacent to Mobile Plant
  11. Dust Control
  12. Sub-grade Layer (refer to engineer design)
  13. Sub-base & Base Layer
  14. Compact Layers
  15. Sealing
  16. Fuelling On-site
  17. On Completion
  18. Emergency Response

All our SWMS Include

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

Instant Document Delivery via Email

FREE Legislation & Codes of Practice Reference List

 

Ready to Use Safe Work Method Statement

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 8am to 5pm AEST, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write a Review
$89.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Civil Road Base and Seal Safe Work Method Statement

    This Civil Road Base and Seal Safe Work Method Statement (SWMS) covers hazards and controls associated with roadbase installation.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Work in an area that may have a contaminated or flammable atmosphere
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

    Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

    Job Steps Covered in Civil Road Base and Seal SWMS:

    (includes potential hazards & control measures)

    1. Training
    2. Planning
    3. Working Outdoors
    4. Arrival On-site & Assess On-site Conditions
    5. Work Area Set-up
    6. Delivery, Set-up & Removal of Machinery
    7. Environment
    8. Housekeeping
    9. Manual Tasks
    10. Working Adjacent to Mobile Plant
    11. Dust Control
    12. Sub-grade Layer (refer to engineer design)
    13. Sub-base & Base Layer
    14. Compact Layers
    15. Sealing
    16. Fuelling On-site
    17. On Completion
    18. Emergency Response

    All our SWMS Include

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

    Instant Document Delivery via Email

    FREE Legislation & Codes of Practice Reference List

     

    Ready to Use Safe Work Method Statement

    Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

    Simply add your company details and read the document to ensure all details are relevant to your business.

    Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

    Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 8am to 5pm AEST, Monday to Friday | Email: info@safetyculture.com.au

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials

You may also need