null

Get 20% off all documents this World Day for Safety and Health at Work. Use code SAFETY2023 at checkout. TODAY ONLY!*.

Transform your workplace with our NEW Psychosocial Hazard Management Plan. Find out more here.

Roofing sheet metal removal job in progress.

Roofing Removal Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Roofing Removal Safe Work Method Statement

This Roofing Removal Safe Work Method Statement (SWMS) covers hazards and controls associated with the removal of roofing materials e.g. tiles, metal sheeting from a roof.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Asbestos disturbance
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Roofing Removal SWMS:

(includes potential hazards & control measures)

  1. Implement a Falls Emergency Rescue Plan
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Working Outdoors
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Accessing the Roof using Mobile Scaffolding or Extension Ladder
  9. Roof Removal
  10. Working with Powered & Non-powered Tools
  11. Hazardous Chemical Use (e.g. silicone, cleaning solutions)
  12. On Completion
  13. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Roofing Removal Safe Work Method Statement

This Roofing Removal Safe Work Method Statement (SWMS) covers hazards and controls associated with the removal of roofing materials e.g. tiles, metal sheeting from a roof.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Asbestos disturbance
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Roofing Removal SWMS:

(includes potential hazards & control measures)

  1. Implement a Falls Emergency Rescue Plan
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Working Outdoors
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Accessing the Roof using Mobile Scaffolding or Extension Ladder
  9. Roof Removal
  10. Working with Powered & Non-powered Tools
  11. Hazardous Chemical Use (e.g. silicone, cleaning solutions)
  12. On Completion
  13. Emergency Response
PDF Download
PDF File

You May Also Need

Hear From Our Customers

  • 5

    A-Z of everything we need

    A-Z of everything we need, more than helpful customer service and all questions answered.
    1st class company!

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View