null

Get 20% off all documents this World Day for Safety and Health at Work. Use code SAFETY2023 at checkout. TODAY ONLY!*.

Transform your workplace with our NEW Psychosocial Hazard Management Plan. Find out more here.

Green lawn and well manicured garden bed

Bark Blower Truck Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Bark Blower Truck Safe Work Method Statement

Bark Blower Truck Safe Work Method Statement covers hazards and controls with the view of ensuring that all reasonably practicable steps have been taken to prevent the likelihood of incident during the operation of a bark blower truck while work is conducted on or near a road and construction worksites.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Bark Blower Truck SWMS

(includes potential hazards and control measures)

  1. Working Outdoors
  2. Coupling/Uncoupling Trailer Models
  3. On-road Travel Between Sites
  4. Loading Material (soil, leaf mulch, bark chip, compost)
  5. Arrival On-site & Assess On-site Conditions
  6. Work Area Set-up
  7. Environment
  8. Housekeeping
  9. Manual Tasks
  10. Spreading Material
  11. Refuelling the Truck
  12. On Completion
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Bark Blower Truck Safe Work Method Statement

Bark Blower Truck Safe Work Method Statement covers hazards and controls with the view of ensuring that all reasonably practicable steps have been taken to prevent the likelihood of incident during the operation of a bark blower truck while work is conducted on or near a road and construction worksites.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Bark Blower Truck SWMS

(includes potential hazards and control measures)

  1. Working Outdoors
  2. Coupling/Uncoupling Trailer Models
  3. On-road Travel Between Sites
  4. Loading Material (soil, leaf mulch, bark chip, compost)
  5. Arrival On-site & Assess On-site Conditions
  6. Work Area Set-up
  7. Environment
  8. Housekeeping
  9. Manual Tasks
  10. Spreading Material
  11. Refuelling the Truck
  12. On Completion
PDF Download
PDF File

You May Also Need

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View