Invest in Safety and Save This EOFY - Maximise your tax deductions with our range of HSEQ documents, tailored to your Industry. Shop our Industry Packages now and save.

Person wearing gloves installing insulation.

Sisalation Insulation Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Sisalation Insulation Safe Work Method Statement

This Sisalation Insulation Safe Work Method Statement (SWMS) covers hazards and controls associated with installing sisalation insulation/wall wrap to structures.

Sisalation can also be referred to as Sarking.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Sisalation Insulation SWMS:

(includes potential hazards & control measures)

  1. Working Outdoors
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Sisalation Handling & Fixing
  8. Fixing Wrap to Walls
  9. Fixing Wrap to Roofs
  10. On Completion
  11. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Sisalation Insulation Safe Work Method Statement

This Sisalation Insulation Safe Work Method Statement (SWMS) covers hazards and controls associated with installing sisalation insulation/wall wrap to structures.

Sisalation can also be referred to as Sarking.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Sisalation Insulation SWMS:

(includes potential hazards & control measures)

  1. Working Outdoors
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Sisalation Handling & Fixing
  8. Fixing Wrap to Walls
  9. Fixing Wrap to Roofs
  10. On Completion
  11. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View