null

Get 20% off all documents this World Day for Safety and Health at Work. Use code SAFETY2023 at checkout. TODAY ONLY!*.

Transform your workplace with our NEW Psychosocial Hazard Management Plan. Find out more here.

person installing insulation in a roof space.

Insulation - Batts Installation Safe Work Method Statement

  • Instant Document Delivery via Email.
  • Add your Logo easily.
  • Add or Delete information to any SWMS template.
  • Customisation Instructions provided.
  • Complies with Australian & New Zealand legislation.
  • Edit documents on the go with Microsoft Office Mobile App
  • Pay Once (no subscriptions required).

Insulation - Batts Installation Safe Work Method Statement

This Insulation - Batts Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the installation, into ceilings and walls, of insulation batts/blankets in existing premises and structure under construction.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Insulation - Batts Installation SWMS:

(includes potential hazards & control measures)

  1. Planning
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Materials Delivery
  8. Insulation Handling
  9. Entering & Exiting the Ceiling Space
  10. Installation
  11. On Completion
  12. Emergency Response

View Document Sample

  • Instant Document Delivery via Email.
  • Add your Logo easily.
  • Add or Delete information to any SWMS template.
  • Customisation Instructions provided.
  • Complies with Australian & New Zealand legislation.
  • Edit documents on the go with Microsoft Office Mobile App
  • Pay Once (no subscriptions required).

Insulation - Batts Installation Safe Work Method Statement

This Insulation - Batts Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the installation, into ceilings and walls, of insulation batts/blankets in existing premises and structure under construction.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Insulation - Batts Installation SWMS:

(includes potential hazards & control measures)

  1. Planning
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Materials Delivery
  8. Insulation Handling
  9. Entering & Exiting the Ceiling Space
  10. Installation
  11. On Completion
  12. Emergency Response

View Document Sample

PDF Download
PDF File

You May Also Need

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View