null

Insulation - Ceiling Panel Installation Safe Work Method Statement

Product SKU: 10642-2

A worker wearing a face mask reaching above head to install insulation in the ceiling
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Insulation - Ceiling Panel Installation Safe Work Method Statement

This Insulation - Ceiling Panel Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the use of an elevating work platform (EWP) to install ceiling panels and insulation.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Silica Dust & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Insulation - Ceiling Panel Installation SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
  3. Arrival On-site & Assess On-site Conditions
  4. Delivery, Set-up & Removal of EWP
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Materials Delivery
  10. Insulation & Plasterboard Handling
  11. Installation from EWP
  12. Fuelling On-site
  13. On Completion
  14. Emergency Response
Write a Review
$89.95
Custom branding available 76BAA198-9788-4A00-A3E8-BC847155F144
  • Personalise your documents with custom branding
  • Custom branding adds your business name, address, ABN and logo where required to the documents in your order
  • $9.95 per cart (no matter how many products are in your order)
  • Upload your details at cart
  • Receive your branded documents shortly after payment

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Insulation - Ceiling Panel Installation Safe Work Method Statement

    This Insulation - Ceiling Panel Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the use of an elevating work platform (EWP) to install ceiling panels and insulation.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

    Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Silica Dust & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Insulation - Ceiling Panel Installation SWMS:

    (includes potential hazards and control measures)

    1. Planning
    2. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
    3. Arrival On-site & Assess On-site Conditions
    4. Delivery, Set-up & Removal of EWP
    5. Work Area Set-up
    6. Environment
    7. Housekeeping
    8. Manual Tasks
    9. Materials Delivery
    10. Insulation & Plasterboard Handling
    11. Installation from EWP
    12. Fuelling On-site
    13. On Completion
    14. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials