Insulation - Ceiling Panel Installation Safe Work Method Statement
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Insulation - Ceiling Panel Installation Safe Work Method Statement
This Insulation - Ceiling Panel Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the use of an elevating work platform (EWP) to install ceiling panels and insulation.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Involves a risk of a person falling from 2m or more, including work on telecommunications towers
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Silica Dust & Environmental Considerations.
Job Steps Covered in Insulation - Ceiling Panel Installation SWMS:
(includes potential hazards and control measures)
- Planning
- Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
- Arrival On-site & Assess On-site Conditions
- Delivery, Set-up & Removal of EWP
- Work Area Set-up
- Environment
- Housekeeping
- Manual Tasks
- Materials Delivery
- Insulation & Plasterboard Handling
- Installation from EWP
- Fuelling On-site
- On Completion
- Emergency Response
We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Insulation - Ceiling Panel Installation Safe Work Method Statement
This Insulation - Ceiling Panel Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the use of an elevating work platform (EWP) to install ceiling panels and insulation.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Involves a risk of a person falling from 2m or more, including work on telecommunications towers
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Silica Dust & Environmental Considerations.
Job Steps Covered in Insulation - Ceiling Panel Installation SWMS:
(includes potential hazards and control measures)
- Planning
- Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
- Arrival On-site & Assess On-site Conditions
- Delivery, Set-up & Removal of EWP
- Work Area Set-up
- Environment
- Housekeeping
- Manual Tasks
- Materials Delivery
- Insulation & Plasterboard Handling
- Installation from EWP
- Fuelling On-site
- On Completion
- Emergency Response
We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.