Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Men working on a fuel tank in a dirt pit.

Fuel Storage Tank Installation Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Fuel Storage Tank Installation Safe Work Method Statement

This Fuel Storage Tank Installation Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls in regards to Fuel Storage Tank Installation.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Fuel Storage Tank Installation SWMS:

(includes potential hazards & control measures).

  1. Planning
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Working Outdoors
  7. Manual Tasks
  8. Materials Delivery
  9. Mark Out, Hole Excavation & Battering
  10. Installing Geofabric Lining (Working in the Excavation)
  11. Installing Tank Anchors, Tank, Ballasting the Tank & Backfilling
  12. Installation of Fittings, Turret Pump, Pipework, Tank Gauging & Pump Switches to Generator Skid Tank
  13. Pressure Test to 50psi
  14. On Completion
  15. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Fuel Storage Tank Installation Safe Work Method Statement

This Fuel Storage Tank Installation Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls in regards to Fuel Storage Tank Installation.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Fuel Storage Tank Installation SWMS:

(includes potential hazards & control measures).

  1. Planning
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Working Outdoors
  7. Manual Tasks
  8. Materials Delivery
  9. Mark Out, Hole Excavation & Battering
  10. Installing Geofabric Lining (Working in the Excavation)
  11. Installing Tank Anchors, Tank, Ballasting the Tank & Backfilling
  12. Installation of Fittings, Turret Pump, Pipework, Tank Gauging & Pump Switches to Generator Skid Tank
  13. Pressure Test to 50psi
  14. On Completion
  15. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View