National Safe Work Month - Equip your team with essential workplace safety solutions this Safe Work Month with 25% off selected essential WHS documentation. Shop now. *T&C's apply. Discount is applied at cart.

Men working on a fuel tank in a dirt pit.

Fuel Storage Tank Installation Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Fuel Storage Tank Installation Safe Work Method Statement

This Fuel Storage Tank Installation Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls in regards to Fuel Storage Tank Installation.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Fuel Storage Tank Installation SWMS:

(includes potential hazards & control measures).

  1. Planning
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Working Outdoors
  7. Manual Tasks
  8. Materials Delivery
  9. Mark Out, Hole Excavation & Battering
  10. Installing Geofabric Lining (Working in the Excavation)
  11. Installing Tank Anchors, Tank, Ballasting the Tank & Backfilling
  12. Installation of Fittings, Turret Pump, Pipework, Tank Gauging & Pump Switches to Generator Skid Tank
  13. Pressure Test to 50psi
  14. On Completion
  15. Emergency Response

 

We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Fuel Storage Tank Installation Safe Work Method Statement

This Fuel Storage Tank Installation Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls in regards to Fuel Storage Tank Installation.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Fuel Storage Tank Installation SWMS:

(includes potential hazards & control measures).

  1. Planning
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Working Outdoors
  7. Manual Tasks
  8. Materials Delivery
  9. Mark Out, Hole Excavation & Battering
  10. Installing Geofabric Lining (Working in the Excavation)
  11. Installing Tank Anchors, Tank, Ballasting the Tank & Backfilling
  12. Installation of Fittings, Turret Pump, Pipework, Tank Gauging & Pump Switches to Generator Skid Tank
  13. Pressure Test to 50psi
  14. On Completion
  15. Emergency Response

 

We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View