Invest in Safety and Save This EOFY - Maximise your tax deductions with our range of HSEQ documents, tailored to your Industry. Shop our Industry Packages now and save.

Person installing vinyl floor strips.

Vinyl Floor Stripping Sealing Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Vinyl Floor Stripping Sealing Safe Work Method Statement

This Vinyl Floor Stripping Sealing Safe Work Method Statement (SWMS) covers hazards and controls associated with the stripping and sealing of vinyl floors.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Asbestos
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Vinyl Floor Stripping Sealing SWMS:

(includes potential hazards & control measures).

  1. Training & Capabilities
  2. Arrival & Assess On-site Conditions
  3. Work Area Set-up
  4. Stripping & Applying Sealant & Buffing
  5. On Completion
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Vinyl Floor Stripping Sealing Safe Work Method Statement

This Vinyl Floor Stripping Sealing Safe Work Method Statement (SWMS) covers hazards and controls associated with the stripping and sealing of vinyl floors.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Asbestos
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Vinyl Floor Stripping Sealing SWMS:

(includes potential hazards & control measures).

  1. Training & Capabilities
  2. Arrival & Assess On-site Conditions
  3. Work Area Set-up
  4. Stripping & Applying Sealant & Buffing
  5. On Completion
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View