null

Vinyl Floor Laying Safe Work Method Statement

Product SKU: 10288-5

Man installing vinyl flooring.
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Vinyl Floor Laying Safe Work Method Statement

This Vinyl Floor Laying Safe Work Method Statement (SWMS) covers hazards and controls when laying vinyl flooring using rolls and/or vinyl tiles.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Remotely &/or Isolated Work, Silica Dust & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Vinyl Floor Laying SWMS:

(includes potential hazards & control measures)

  1. Out-of-Hours/Night Work
  2. Working Alone
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Materials Delivery by Truck
  6. Environment
  7. Housekeeping
  8. Working with Powered & Non-powered Tools
  9. Concrete Floor Preparation
  10. Timber Floor Preparation including Laying Plywood Underlay
  11. Spreading Adhesives
  12. Cutting, Seaming & Laying Vinyl Sheeting & Tiles
  13. Vinyl Welding
  14. On Completion
  15. Emergency Response

 

View PDF document sample

 

Write a Review
$89.95
Custom branding available 76BAA198-9788-4A00-A3E8-BC847155F144
  • Personalise your documents with custom branding
  • Custom branding adds your business name, address, ABN and logo where required to the documents in your order
  • $9.95 per cart (no matter how many products are in your order)
  • Upload your details at cart
  • Receive your branded documents shortly after payment

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Vinyl Floor Laying Safe Work Method Statement

    This Vinyl Floor Laying Safe Work Method Statement (SWMS) covers hazards and controls when laying vinyl flooring using rolls and/or vinyl tiles.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Work in an area that may have a contaminated or flammable atmosphere

    Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Remotely &/or Isolated Work, Silica Dust & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Vinyl Floor Laying SWMS:

    (includes potential hazards & control measures)

    1. Out-of-Hours/Night Work
    2. Working Alone
    3. Arrival On-site & Assess On-site Conditions
    4. Work Area Set-up
    5. Materials Delivery by Truck
    6. Environment
    7. Housekeeping
    8. Working with Powered & Non-powered Tools
    9. Concrete Floor Preparation
    10. Timber Floor Preparation including Laying Plywood Underlay
    11. Spreading Adhesives
    12. Cutting, Seaming & Laying Vinyl Sheeting & Tiles
    13. Vinyl Welding
    14. On Completion
    15. Emergency Response

     

    View PDF document sample

     

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials