null

Shed Construction Safe Work Method Statement

Product SKU: 10480-2

Constructed Shed
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Shed Construction Safe Work Method Statement

This Shed Construction Safe Work Method Statement (SWMS) covers hazards and controls associated with the delivery and assembly of steel sheds.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Shed Construction SWMS:

(includes potential hazards & control measures)

  1. Planning & Preparation
  2. Working Outdoors
  3. Arrival On-site & Assess On-site Conditions
  4. Materials Delivery
  5. Work Area Set-up
  6. Working at Height on Ladders, Trestles, Mobile Scaffold, Fixed Scaffold & Openings
  7. Environment
  8. Housekeeping
  9. Manual Tasks
  10. Working with Powered & Non-powered Tools
  11. Hazardous Substance/Chemical Use
  12. Shed Construction
  13. On Completion
  14. Emergency Response
Write a Review
$89.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Shed Construction Safe Work Method Statement

    This Shed Construction Safe Work Method Statement (SWMS) covers hazards and controls associated with the delivery and assembly of steel sheds.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Shed Construction SWMS:

    (includes potential hazards & control measures)

    1. Planning & Preparation
    2. Working Outdoors
    3. Arrival On-site & Assess On-site Conditions
    4. Materials Delivery
    5. Work Area Set-up
    6. Working at Height on Ladders, Trestles, Mobile Scaffold, Fixed Scaffold & Openings
    7. Environment
    8. Housekeeping
    9. Manual Tasks
    10. Working with Powered & Non-powered Tools
    11. Hazardous Substance/Chemical Use
    12. Shed Construction
    13. On Completion
    14. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials

You may also need