Pump valve

Plumbing Pump-Valve Installation Safe Work Method Statement

  • Instant Document Delivery via Email.
  • Add to your existing management system.
  • Can assist in ensuring workers are adequately trained.
  • Customisation instructions provided.
  • Microsoft Word Format (Fully editable).
  • Only pay once (no subscriptions required).

Plumbing Pump-Valve Installation Safe Work Method Statement (SWMS)

This Plumbing Pump-Valve Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the removal and installation of industrial pumps and valves. This SWMS is also suitable for the installation of fire service booster assemblies and hydrants.

Job Steps Covered in Plumbing Pump-Valve Installation SWMS

  1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust: Education of workers on RCS dust and its prevention.
  2. Planning: Involves identifying confined spaces and requiring a dedicated SWMS.
  3. Check Weather Conditions & Prepare: Work is not conducted in extreme weather conditions.
  4. Arrival On-site & Assess On-site Conditions: Involves vehicle positioning and site-specific inductions.
  5. Work Area Set-up: Establishes exclusion zones to prevent unauthorised access.
  6. Environment: Addresses noise, waste, and environmental impacts.
  7. Housekeeping: Maintains cleanliness to prevent slips, trips, and falls.
  8. Manual Tasks: Reduces the risk of musculoskeletal disorder injuries.
  9. Materials Delivery: Prevents truck rollover and safe unloading.
  10. Working with Powered & Non-powered Tools: Covers safe use of powered and non-powered tools.
  11. Hazardous Substance/Chemical Use: Proper handling and use of chemicals.
  12. Working at Height on Ladders: Implements measures to prevent falls.
  13. Welding, Soldering & Cutting: Addresses fire risks and proper PPE use.
  14. Disconnect Existing Pump/Motor/Valve: Covers LOTO procedures and safe disconnection.
  15. Lifting Pumps-Motors-Valves into/out of Position: Establishes controls to prevent injury.
  16. Gasket Removal/Flange Cleaning: Prevents cuts and fire hazards.
  17. Fitting New Pump/Motor/Valve: Addresses electrical safety and pressure testing.
  18. Testing New System: System is free of leaks and operational.
  19. On Completion: Secures the site and equipment.
  20. Emergency Response: Outlines response control measures for injury, fatality, or environmental damage.

Each purchase of our SWMS comes with a complimentary copy of the Legislation & Codes of Practice Reference List, valued at $19.95. This valuable resource provides an up-to-date overview of relevant laws and standards, further supporting your compliance efforts.

Key Features of the SWMS

  • Compliance with Legislation: Adherence to Australian safety laws.
  • Hazard Management: Identifies and mitigates potential risks in pump-valve installation.
  • Emergency Response: Outlines a response for handling emergencies effectively.
  • Environmental Protection: Incorporates measures to minimise environmental impact.

Who is it Suitable For?

This SWMS is essential for professionals involved in plumbing, fire service installations, and any work requiring pump-valve installation. It is particularly beneficial for:

  • Plumbers
  • Safety Officers
  • Construction Managers
  • Environmental Consultants

Elevate your safety standards and ensure regulatory compliance with our Plumbing Pump-Valve Installation SWMS. Get instant access and start implementing best practices today.

  • Instant Document Delivery via Email.
  • Add to your existing management system.
  • Can assist in ensuring workers are adequately trained.
  • Customisation instructions provided.
  • Microsoft Word Format (Fully editable).
  • Only pay once (no subscriptions required).

Plumbing Pump-Valve Installation Safe Work Method Statement (SWMS)

This Plumbing Pump-Valve Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the removal and installation of industrial pumps and valves. This SWMS is also suitable for the installation of fire service booster assemblies and hydrants.

Job Steps Covered in Plumbing Pump-Valve Installation SWMS

  1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust: Education of workers on RCS dust and its prevention.
  2. Planning: Involves identifying confined spaces and requiring a dedicated SWMS.
  3. Check Weather Conditions & Prepare: Work is not conducted in extreme weather conditions.
  4. Arrival On-site & Assess On-site Conditions: Involves vehicle positioning and site-specific inductions.
  5. Work Area Set-up: Establishes exclusion zones to prevent unauthorised access.
  6. Environment: Addresses noise, waste, and environmental impacts.
  7. Housekeeping: Maintains cleanliness to prevent slips, trips, and falls.
  8. Manual Tasks: Reduces the risk of musculoskeletal disorder injuries.
  9. Materials Delivery: Prevents truck rollover and safe unloading.
  10. Working with Powered & Non-powered Tools: Covers safe use of powered and non-powered tools.
  11. Hazardous Substance/Chemical Use: Proper handling and use of chemicals.
  12. Working at Height on Ladders: Implements measures to prevent falls.
  13. Welding, Soldering & Cutting: Addresses fire risks and proper PPE use.
  14. Disconnect Existing Pump/Motor/Valve: Covers LOTO procedures and safe disconnection.
  15. Lifting Pumps-Motors-Valves into/out of Position: Establishes controls to prevent injury.
  16. Gasket Removal/Flange Cleaning: Prevents cuts and fire hazards.
  17. Fitting New Pump/Motor/Valve: Addresses electrical safety and pressure testing.
  18. Testing New System: System is free of leaks and operational.
  19. On Completion: Secures the site and equipment.
  20. Emergency Response: Outlines response control measures for injury, fatality, or environmental damage.

Each purchase of our SWMS comes with a complimentary copy of the Legislation & Codes of Practice Reference List, valued at $19.95. This valuable resource provides an up-to-date overview of relevant laws and standards, further supporting your compliance efforts.

Key Features of the SWMS

  • Compliance with Legislation: Adherence to Australian safety laws.
  • Hazard Management: Identifies and mitigates potential risks in pump-valve installation.
  • Emergency Response: Outlines a response for handling emergencies effectively.
  • Environmental Protection: Incorporates measures to minimise environmental impact.

Who is it Suitable For?

This SWMS is essential for professionals involved in plumbing, fire service installations, and any work requiring pump-valve installation. It is particularly beneficial for:

  • Plumbers
  • Safety Officers
  • Construction Managers
  • Environmental Consultants

Elevate your safety standards and ensure regulatory compliance with our Plumbing Pump-Valve Installation SWMS. Get instant access and start implementing best practices today.

PDF Download
PDF File

Hear From Our Customers

  • 5

    Great service, reasonably priced, good product.

    Great service, reasonably priced, good product.

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View