Plumbing Pump-Valve Installation Safe Work Method Statement

This Plumbing Pump-Valve Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the removal and installation of industrial pumps and valves.

This SWMS is also suitable for the installation of fire servicebooster assemblies and hydrants.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Plumbing Pump-Valve Installation SWMS:

(includes potential hazards and control measures)

  1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
  2. Planning
  3. Working Outdoors
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Materials Delivery
  10. Working with Powered & Non-powered Tools
  11. Hazardous Substance/Chemical Use
  12. Working at Height on Ladders
  13. Welding, Soldering & Cutting
  14. Disconnect Existing Pump/Motor/Valve
  15. Lifting Pumps (motors-valves into/out of position)
  16. Gasket Removal/Flange Cleaning
  17. Fit New Pump/Motor/Valve
  18. Testing New System
  19. On Completion
  20. Emergency Response
Write a Review
$89.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Plumbing Pump-Valve Installation Safe Work Method Statement

    This Plumbing Pump-Valve Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the removal and installation of industrial pumps and valves.

    This SWMS is also suitable for the installation of fire servicebooster assemblies and hydrants.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Work in an area that may have a contaminated or flammable atmosphere

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Plumbing Pump-Valve Installation SWMS:

    (includes potential hazards and control measures)

    1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
    2. Planning
    3. Working Outdoors
    4. Arrival On-site & Assess On-site Conditions
    5. Work Area Set-up
    6. Environment
    7. Housekeeping
    8. Manual Tasks
    9. Materials Delivery
    10. Working with Powered & Non-powered Tools
    11. Hazardous Substance/Chemical Use
    12. Working at Height on Ladders
    13. Welding, Soldering & Cutting
    14. Disconnect Existing Pump/Motor/Valve
    15. Lifting Pumps (motors-valves into/out of position)
    16. Gasket Removal/Flange Cleaning
    17. Fit New Pump/Motor/Valve
    18. Testing New System
    19. On Completion
    20. Emergency Response