LOTO Safe Work Method Statement
This LOTO Safe Work Method Statement (SWMS) covers hazards and controls involved with the Lock Out/Tag Out (LOTO) of plant and equipment.
This document applies to all items of plant and equipment that is acquired (purchased/hired/leased/loaned/donated), installed, used, and operated, stored or maintained on site.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Confined Spaces
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.
Job Steps Covered in LOTO SWMS:
(includes potential hazards & control measures)
- Develop Written Procedures (SOP) for Isolation of Specific Plant
- Training
- Confined Spaces
- Arrival On-site & Assess On-site Conditions
- Pre-start
- Housekeeping
- Manual Tasks
- Isolate Electrical Supply
- Lock Out/Tag Out of Plant
- Restoring Equipment to Service
- On Completion
- Emergency Response
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Edit documents on the go with Microsoft Office Mobile App
- Only pay once (no subscriptions required).
LOTO Safe Work Method Statement
This LOTO Safe Work Method Statement (SWMS) covers hazards and controls involved with the Lock Out/Tag Out (LOTO) of plant and equipment.
This document applies to all items of plant and equipment that is acquired (purchased/hired/leased/loaned/donated), installed, used, and operated, stored or maintained on site.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Confined Spaces
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.
Job Steps Covered in LOTO SWMS:
(includes potential hazards & control measures)
- Develop Written Procedures (SOP) for Isolation of Specific Plant
- Training
- Confined Spaces
- Arrival On-site & Assess On-site Conditions
- Pre-start
- Housekeeping
- Manual Tasks
- Isolate Electrical Supply
- Lock Out/Tag Out of Plant
- Restoring Equipment to Service
- On Completion
- Emergency Response