Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Deep square concrete pit.

Pit Construction Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Pit Construction Safe Work Method Statement

This Pit Construction Safe Work Method Statement (SWMS) covers hazards and controls associated with the construction of a concrete pit.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Working at depths greater than 1.5 Metres, including tunnels or mines
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Pit Construction SWMS:

(includes potential hazards and control measures)

  1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
  2. Planning
  3. Working Outdoors
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Materials Delivery
  10. Working with Powered & Non-powered Tools
  11. Excavating Foundations
  12. Concrete Base
  13. Setting Steel Reinforcement (concrete base & walls)
  14. Formwork (in-situ construction)
  15. Formwork (prefabricated placement by mobile plant)
  16. Applying Bond Breakers
  17. Pouring Concrete (base & walls)
  18. Stripping Formwork
  19. On Completion
  20. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Pit Construction Safe Work Method Statement

This Pit Construction Safe Work Method Statement (SWMS) covers hazards and controls associated with the construction of a concrete pit.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Working at depths greater than 1.5 Metres, including tunnels or mines
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Pit Construction SWMS:

(includes potential hazards and control measures)

  1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
  2. Planning
  3. Working Outdoors
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Materials Delivery
  10. Working with Powered & Non-powered Tools
  11. Excavating Foundations
  12. Concrete Base
  13. Setting Steel Reinforcement (concrete base & walls)
  14. Formwork (in-situ construction)
  15. Formwork (prefabricated placement by mobile plant)
  16. Applying Bond Breakers
  17. Pouring Concrete (base & walls)
  18. Stripping Formwork
  19. On Completion
  20. Emergency Response
PDF Download
PDF File

Hear From Our Customers

  • 5

    Easy & efficient. Very specific.

    Easy & efficient. Very specific.

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View