Pit Construction Safe Work Method Statement
This Pit Construction Safe Work Method Statement (SWMS) covers hazards and controls associated with the construction of a concrete pit.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Working at depths greater than 1.5 Metres, including tunnels or mines
- Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.
Job Steps Covered in Pit Construction SWMS:
(includes potential hazards and control measures)
- Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
- Planning
- Working Outdoors
- Arrival On-site & Assess On-site Conditions
- Work Area Set-up
- Environment
- Housekeeping
- Manual Tasks
- Materials Delivery
- Working with Powered & Non-powered Tools
- Excavating Foundations
- Concrete Base
- Setting Steel Reinforcement (concrete base & walls)
- Formwork (in-situ construction)
- Formwork (prefabricated placement by mobile plant)
- Applying Bond Breakers
- Pouring Concrete (base & walls)
- Stripping Formwork
- On Completion
- Emergency Response
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Pit Construction Safe Work Method Statement
This Pit Construction Safe Work Method Statement (SWMS) covers hazards and controls associated with the construction of a concrete pit.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Working at depths greater than 1.5 Metres, including tunnels or mines
- Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.
Job Steps Covered in Pit Construction SWMS:
(includes potential hazards and control measures)
- Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
- Planning
- Working Outdoors
- Arrival On-site & Assess On-site Conditions
- Work Area Set-up
- Environment
- Housekeeping
- Manual Tasks
- Materials Delivery
- Working with Powered & Non-powered Tools
- Excavating Foundations
- Concrete Base
- Setting Steel Reinforcement (concrete base & walls)
- Formwork (in-situ construction)
- Formwork (prefabricated placement by mobile plant)
- Applying Bond Breakers
- Pouring Concrete (base & walls)
- Stripping Formwork
- On Completion
- Emergency Response