Invest in Safety and Save This EOFY - Maximise your tax deductions with our range of HSEQ documents, tailored to your Industry. Shop our Industry Packages now and save.

Deep square concrete pit.

Pit Construction Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Pit Construction Safe Work Method Statement

This Pit Construction Safe Work Method Statement (SWMS) covers hazards and controls associated with the construction of a concrete pit.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Working at depths greater than 1.5 Metres, including tunnels or mines
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Pit Construction SWMS:

(includes potential hazards and control measures)

  1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
  2. Planning
  3. Working Outdoors
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Materials Delivery
  10. Working with Powered & Non-powered Tools
  11. Excavating Foundations
  12. Concrete Base
  13. Setting Steel Reinforcement (concrete base & walls)
  14. Formwork (in-situ construction)
  15. Formwork (prefabricated placement by mobile plant)
  16. Applying Bond Breakers
  17. Pouring Concrete (base & walls)
  18. Stripping Formwork
  19. On Completion
  20. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Pit Construction Safe Work Method Statement

This Pit Construction Safe Work Method Statement (SWMS) covers hazards and controls associated with the construction of a concrete pit.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Working at depths greater than 1.5 Metres, including tunnels or mines
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Pit Construction SWMS:

(includes potential hazards and control measures)

  1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
  2. Planning
  3. Working Outdoors
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Materials Delivery
  10. Working with Powered & Non-powered Tools
  11. Excavating Foundations
  12. Concrete Base
  13. Setting Steel Reinforcement (concrete base & walls)
  14. Formwork (in-situ construction)
  15. Formwork (prefabricated placement by mobile plant)
  16. Applying Bond Breakers
  17. Pouring Concrete (base & walls)
  18. Stripping Formwork
  19. On Completion
  20. Emergency Response
PDF Download
PDF File

Hear From Our Customers

  • 5

    Easy & efficient. Very specific.

    Easy & efficient. Very specific.

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View