null

Get 20% off all documents this World Day for Safety and Health at Work. Use code SAFETY2023 at checkout. TODAY ONLY!*.

Transform your workplace with our NEW Psychosocial Hazard Management Plan. Find out more here.

Glass Lift Shaft Installation being conducted

Glass Lift Shaft Installation Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Glass Lift Shaft Installation Safe Work Method Statement

This Glass Lift Shaft Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with glass lift shaft installation.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Glass Lift Shaft Installation SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Hazardous Substance/Chemical Use
  8. Delivery, Set-up & Removal of EWP
  9. Positioning, Drilling & Tapping of Hole Centres (working on scaffolding)
  10. Install Fittings (working in EWP)
  11. Glazing
  12. Fuelling the EWP
  13. On Completion
  14. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Glass Lift Shaft Installation Safe Work Method Statement

This Glass Lift Shaft Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with glass lift shaft installation.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Glass Lift Shaft Installation SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Hazardous Substance/Chemical Use
  8. Delivery, Set-up & Removal of EWP
  9. Positioning, Drilling & Tapping of Hole Centres (working on scaffolding)
  10. Install Fittings (working in EWP)
  11. Glazing
  12. Fuelling the EWP
  13. On Completion
  14. Emergency Response
PDF Download
PDF File

You May Also Need

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View