null

Cool Room Construction Safe Work Method Statement

Product SKU: 10599-3

A cool room with overhanging pipes running along the roof.
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Cool Room Construction Safe Work Method Statement

Our sandwich panel installation method statement is the perfect solution for anyone who needs help with their cool room construction. It covers all of the hazards and controls associated with building insulated panels that are used in cool rooms or freezers.

We have included everything you need to know about how to keep yourself and others safe while working on these types of projects. This document will ensure that everyone involved knows precisely what they should be doing throughout the entire process, so there are no accidents along the way.

You can feel confident knowing that our Cold Room Safe Work Method Statement (SWMS) has been created by industry experts who understand all of your concerns when it comes to building a new cold storage facility or freezer room from scratch, such as mobile plant movement,  risks of a person falling from 2m or more, and work near telecommunications towers.

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Cool Room Construction SWMS:

(includes potential hazards and control measures)

  1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
  2. Planning
  3. Working Outdoors
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Materials Delivery
  10. Working with Powered & Non-powered Tools
  11. Hazardous Substance/Chemical Use
  12. Working at Height on Ladders, Trestles, Mobile Scaffold, Fixed Scaffold & Openings
  13. Cutting, Trimming, Joining Panels & Angle Lengths
  14. Positioning & Levelling Base Panels
  15. Standing Wall Panels & Installing Roof Panels
  16. Working Around Powered Mobile Plant
  17. On Completion
  18. Emergency Response
Write a Review
$89.95
Custom branding available 76BAA198-9788-4A00-A3E8-BC847155F144
  • Personalise your documents with custom branding
  • Custom branding adds your business name, address, ABN and logo where required to the documents in your order
  • $9.95 per cart (no matter how many products are in your order)
  • Upload your details at cart
  • Receive your branded documents shortly after payment

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Cool Room Construction Safe Work Method Statement

    Our sandwich panel installation method statement is the perfect solution for anyone who needs help with their cool room construction. It covers all of the hazards and controls associated with building insulated panels that are used in cool rooms or freezers.

    We have included everything you need to know about how to keep yourself and others safe while working on these types of projects. This document will ensure that everyone involved knows precisely what they should be doing throughout the entire process, so there are no accidents along the way.

    You can feel confident knowing that our Cold Room Safe Work Method Statement (SWMS) has been created by industry experts who understand all of your concerns when it comes to building a new cold storage facility or freezer room from scratch, such as mobile plant movement,  risks of a person falling from 2m or more, and work near telecommunications towers.

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Cool Room Construction SWMS:

    (includes potential hazards and control measures)

    1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
    2. Planning
    3. Working Outdoors
    4. Arrival On-site & Assess On-site Conditions
    5. Work Area Set-up
    6. Environment
    7. Housekeeping
    8. Manual Tasks
    9. Materials Delivery
    10. Working with Powered & Non-powered Tools
    11. Hazardous Substance/Chemical Use
    12. Working at Height on Ladders, Trestles, Mobile Scaffold, Fixed Scaffold & Openings
    13. Cutting, Trimming, Joining Panels & Angle Lengths
    14. Positioning & Levelling Base Panels
    15. Standing Wall Panels & Installing Roof Panels
    16. Working Around Powered Mobile Plant
    17. On Completion
    18. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials