Cool Room Repair Safe Work Method Statement

This Cool Room Repair Safe Work Method Statement (SWMS) covers hazards and controls associated with operating an EWP to perform maintenance and repairs on cool/freezer rooms.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Artificial extremes of temperature
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hot Work, Hazardous Manual Tasks & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Cool Room Repair SWMS:

(includes potential hazards & control measures).

  1. Out-of-Hours/Night Work
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Delivery, Set-up & Removal of EWP
  8. System Evacuation
  9. Cleaning & Flushing
  10. Refrigerant Charging
  11. Preparing Replacement Parts
  12. Installing Replacement Parts
  13. Fuelling the EWP
  14. Test & Commission
  15. On Completion
  16. Emergency Response
Write a Review
$89.95
Custom branding available 76BAA198-9788-4A00-A3E8-BC847155F144
  • Personalise your documents with custom branding
  • Custom branding adds your business name, address, ABN and logo where required to the documents in your order
  • $9.95 per cart (no matter how many products are in your order)
  • Upload your details at cart
  • Receive your branded documents shortly after payment

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Cool Room Repair Safe Work Method Statement

    This Cool Room Repair Safe Work Method Statement (SWMS) covers hazards and controls associated with operating an EWP to perform maintenance and repairs on cool/freezer rooms.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Artificial extremes of temperature
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Involves a risk of a person falling from 2m or more, including work on telecommunications towers
    • Work in an area that may have a contaminated or flammable atmosphere

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hot Work, Hazardous Manual Tasks & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Cool Room Repair SWMS:

    (includes potential hazards & control measures).

    1. Out-of-Hours/Night Work
    2. Arrival On-site & Assess On-site Conditions
    3. Work Area Set-up
    4. Environment
    5. Housekeeping
    6. Manual Tasks
    7. Delivery, Set-up & Removal of EWP
    8. System Evacuation
    9. Cleaning & Flushing
    10. Refrigerant Charging
    11. Preparing Replacement Parts
    12. Installing Replacement Parts
    13. Fuelling the EWP
    14. Test & Commission
    15. On Completion
    16. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials