Pre-cast Tilt-up Panels Safe Work Method Statement

This Pre-cast Tilt-up Panels Safe Work Method Statement (SWMS) covers hazards and controls associated with the general safety of carrying out work that involves the casting of tilt-up/precast concrete panels. 

This SWMS does not cover the lifting of tilt-up/precast panels into place.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Pre-cast Tilt-up Panels SWMS:

(includes potential hazards and control measures)

  1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
  2. Temporary Casting Bed-design
  3. Concrete Panel Design
  4. Working Outdoors
  5. Arrival On-site & Assess On-site Conditions
  6. Work Area Set-up
  7. Environment
  8. Housekeeping
  9. Manual Tasks
  10. Materials Delivery
  11. Working with Powered & Non-powered Tools
  12. Erecting Formwork
  13. Applying Bond Breakers/Release Agents
  14. Setting Steel Reinforcement/Lifting
  15. Tying Steel Reinforcement
  16. Placing & Finishing Concrete
  17. Removing/Stripping Formwork
  18. On Completion
  19. Emergency Response
Write a Review
$89.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Pre-cast Tilt-up Panels Safe Work Method Statement

    This Pre-cast Tilt-up Panels Safe Work Method Statement (SWMS) covers hazards and controls associated with the general safety of carrying out work that involves the casting of tilt-up/precast concrete panels. 

    This SWMS does not cover the lifting of tilt-up/precast panels into place.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement

    Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Pre-cast Tilt-up Panels SWMS:

    (includes potential hazards and control measures)

    1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
    2. Temporary Casting Bed-design
    3. Concrete Panel Design
    4. Working Outdoors
    5. Arrival On-site & Assess On-site Conditions
    6. Work Area Set-up
    7. Environment
    8. Housekeeping
    9. Manual Tasks
    10. Materials Delivery
    11. Working with Powered & Non-powered Tools
    12. Erecting Formwork
    13. Applying Bond Breakers/Release Agents
    14. Setting Steel Reinforcement/Lifting
    15. Tying Steel Reinforcement
    16. Placing & Finishing Concrete
    17. Removing/Stripping Formwork
    18. On Completion
    19. Emergency Response