null

Concrete Placement and Finishing Safe Work Method Statement

Product SKU: 10064-7

Image of a construction site where fresh concrete has been poured and a troweling machine is being used to smooth the concrete
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Concrete Placement and Finishing Safe Work Method Statement

This Concrete Placement and Finishing Safe Work Method Statement (SWMS) covers hazards and controls associated with concrete placement and finishing.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Concrete Placement and Finishing SWMS:

(includes potential hazards and control measures)

  1. Working Outdoors
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Working with Powered & Non-powered Tools
  8. Hazardous Substance/Chemical Use
  9. Pre-start Check of the Work Area
  10. Concrete Delivery, Concrete & Finish
  11. Fuelling Small Engines On-site
  12. On Completion
  13. Emergency Response
Write a Review
$89.95
Custom branding available 76BAA198-9788-4A00-A3E8-BC847155F144
  • Personalise your documents with custom branding
  • Custom branding adds your business name, address, ABN and logo where required to the documents in your order
  • $9.95 per cart (no matter how many products are in your order)
  • Upload your details at cart
  • Receive your branded documents shortly after payment

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Concrete Placement and Finishing Safe Work Method Statement

    This Concrete Placement and Finishing Safe Work Method Statement (SWMS) covers hazards and controls associated with concrete placement and finishing.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Work in an area that may have a contaminated or flammable atmosphere

    Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Concrete Placement and Finishing SWMS:

    (includes potential hazards and control measures)

    1. Working Outdoors
    2. Arrival On-site & Assess On-site Conditions
    3. Work Area Set-up
    4. Environment
    5. Housekeeping
    6. Manual Tasks
    7. Working with Powered & Non-powered Tools
    8. Hazardous Substance/Chemical Use
    9. Pre-start Check of the Work Area
    10. Concrete Delivery, Concrete & Finish
    11. Fuelling Small Engines On-site
    12. On Completion
    13. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials