National Safe Work Month - Equip your team with essential workplace safety solutions this Safe Work Month with 25% off selected essential WHS documentation. Shop now. *T&C's apply. Discount is applied at cart.

Guy using a harness and rope.

Cladding Removal-Installation Rope Access Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Cladding Removal-Installation Rope Access Safe Work Method Statement

This Cladding Removal-Installation Rope Access Safe Work Method Statement (SWMS) covers hazards and controls for using a rope system to remove and replace combustible cladding. It ensures all operations are safe and effective.

Job Steps Covered in Cladding Removal-Installation Rope Access SWMS

  1. Planning: Provides guidelines to plan and reduce risks before starting work, including assessing the scope, identifying hazards, and allocating resources.
  2. Implement a Falls Emergency Rescue Plan: Outlines procedures to implement a rescue plan in case of a fall, including identifying rescue equipment and conducting rescue drills.
  3. Arrival On-site & Assess On-site Conditions: Details the initial steps for site assessment upon arrival, including checking for hazards and setting up warning signs.
  4. Establish On-site Systems: Provides guidelines for setting up on-site systems, including communication protocols and safety checklists.
  5. Materials & Waste Delivery & Removal: Details procedures for the safe delivery and removal of materials and waste, including proper storage and handling.
  6. Working Outdoors: Addresses challenges and safety considerations of outdoor operations, including weather conditions and environmental factors.
  7. Environment: Outlines measures to protect the environment during operations, including managing waste and minimising noise and dust.
  8. Housekeeping: Emphasises the importance of maintaining a clean and organised worksite, including regular cleaning and waste management.
  9. Manual Tasks: Provides protocols to minimise risk during manual handling tasks, including proper lifting techniques and use of mechanical aids.
  10. Pre-inspect System, Harnesses, Lifting Equipment & Anchor Points: Details procedures for pre-inspecting the rope system, harnesses, lifting equipment, and anchor points.
  11. Test Anchor Points: Outlines steps for testing anchor points to ensure they are secure and capable of supporting the load.
  12. Removing & Replacing Cladding using a Rope System: Provides procedures for safely removing and replacing cladding using a rope system.
  13. Dismantling: Details procedures for safely dismantling the rope system and other equipment.
  14. On Completion: Details steps for safely concluding operations and site cleanup, including removing equipment and final inspections.
  15. Emergency Response: Outlines emergency procedures to follow in case of an incident, including first aid and evacuation plans.

Key SWMS Features

  • Comprehensive Hazard Management: Includes controls for working at height.
  • Fall Protection: Details robust measures to prevent falls from heights, including fall protection systems, thorough risk assessments, and emergency rescue plans.
  • User-Friendly Design: Presented in a clear, straightforward format to make it easy for all team members to understand and implement the safety measures.
  • Up-to-Date Compliance: Ensures all safety measures and procedures comply with current regulations and industry standards, providing the latest information for workplace safety.

Each purchase of our SWMS comes with a complimentary copy of the Legislation & Codes of Practice Reference List, valued at $19.95. This valuable resource provides an up-to-date overview of relevant laws and standards, further supporting your compliance efforts.

Who is it Suitable for

  • Rope Access Technicians: Ensures comprehensive safety protocols for removing and installing cladding using rope access systems.
  • Facade Installation Contractors: Provides detailed guidelines for safe and effective cladding work using rope access techniques.
  • Public Works Departments: Assists in maintaining high safety standards during projects involving cladding removal and installation.
  • Site Supervisors: Offers comprehensive guidelines to oversee safe work practices and regulatory compliance during cladding removal and installation tasks using rope systems.

Invest in the Cladding Removal-Installation Rope Access SWMS today to ensure safe and efficient operations.

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Cladding Removal-Installation Rope Access Safe Work Method Statement

This Cladding Removal-Installation Rope Access Safe Work Method Statement (SWMS) covers hazards and controls for using a rope system to remove and replace combustible cladding. It ensures all operations are safe and effective.

Job Steps Covered in Cladding Removal-Installation Rope Access SWMS

  1. Planning: Provides guidelines to plan and reduce risks before starting work, including assessing the scope, identifying hazards, and allocating resources.
  2. Implement a Falls Emergency Rescue Plan: Outlines procedures to implement a rescue plan in case of a fall, including identifying rescue equipment and conducting rescue drills.
  3. Arrival On-site & Assess On-site Conditions: Details the initial steps for site assessment upon arrival, including checking for hazards and setting up warning signs.
  4. Establish On-site Systems: Provides guidelines for setting up on-site systems, including communication protocols and safety checklists.
  5. Materials & Waste Delivery & Removal: Details procedures for the safe delivery and removal of materials and waste, including proper storage and handling.
  6. Working Outdoors: Addresses challenges and safety considerations of outdoor operations, including weather conditions and environmental factors.
  7. Environment: Outlines measures to protect the environment during operations, including managing waste and minimising noise and dust.
  8. Housekeeping: Emphasises the importance of maintaining a clean and organised worksite, including regular cleaning and waste management.
  9. Manual Tasks: Provides protocols to minimise risk during manual handling tasks, including proper lifting techniques and use of mechanical aids.
  10. Pre-inspect System, Harnesses, Lifting Equipment & Anchor Points: Details procedures for pre-inspecting the rope system, harnesses, lifting equipment, and anchor points.
  11. Test Anchor Points: Outlines steps for testing anchor points to ensure they are secure and capable of supporting the load.
  12. Removing & Replacing Cladding using a Rope System: Provides procedures for safely removing and replacing cladding using a rope system.
  13. Dismantling: Details procedures for safely dismantling the rope system and other equipment.
  14. On Completion: Details steps for safely concluding operations and site cleanup, including removing equipment and final inspections.
  15. Emergency Response: Outlines emergency procedures to follow in case of an incident, including first aid and evacuation plans.

Key SWMS Features

  • Comprehensive Hazard Management: Includes controls for working at height.
  • Fall Protection: Details robust measures to prevent falls from heights, including fall protection systems, thorough risk assessments, and emergency rescue plans.
  • User-Friendly Design: Presented in a clear, straightforward format to make it easy for all team members to understand and implement the safety measures.
  • Up-to-Date Compliance: Ensures all safety measures and procedures comply with current regulations and industry standards, providing the latest information for workplace safety.

Each purchase of our SWMS comes with a complimentary copy of the Legislation & Codes of Practice Reference List, valued at $19.95. This valuable resource provides an up-to-date overview of relevant laws and standards, further supporting your compliance efforts.

Who is it Suitable for

  • Rope Access Technicians: Ensures comprehensive safety protocols for removing and installing cladding using rope access systems.
  • Facade Installation Contractors: Provides detailed guidelines for safe and effective cladding work using rope access techniques.
  • Public Works Departments: Assists in maintaining high safety standards during projects involving cladding removal and installation.
  • Site Supervisors: Offers comprehensive guidelines to oversee safe work practices and regulatory compliance during cladding removal and installation tasks using rope systems.

Invest in the Cladding Removal-Installation Rope Access SWMS today to ensure safe and efficient operations.

PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View