Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Guy using a harness and rope.

Cladding Removal-Installation Rope Access Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Cladding Removal-Installation Rope Access Safe Work Method Statement

This Cladding Removal-Installation Rope Access Safe Work Method Statement (SWMS) covers hazards and controls associated with the removal of combustible cladding and cladding replacement using a rope system.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Cladding Removal-Installation Rope Access SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Implement a Falls Emergency Rescue Plan
  3. Arrival On-site & Assess On-site Conditions
  4. Establish On-site Systems
  5. Materials & Waste Delivery & Removal
  6. Working Outdoors
  7. Environment
  8. Housekeeping
  9. Manual Tasks
  10. Pre-inspect System, Harnesses, Lifting Equipment & Anchor Points
  11. Test Anchor Points
  12. Removing & Replacing Cladding using a Rope System
  13. Dismantling
  14. On Completion
  15. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Cladding Removal-Installation Rope Access Safe Work Method Statement

This Cladding Removal-Installation Rope Access Safe Work Method Statement (SWMS) covers hazards and controls associated with the removal of combustible cladding and cladding replacement using a rope system.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Cladding Removal-Installation Rope Access SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Implement a Falls Emergency Rescue Plan
  3. Arrival On-site & Assess On-site Conditions
  4. Establish On-site Systems
  5. Materials & Waste Delivery & Removal
  6. Working Outdoors
  7. Environment
  8. Housekeeping
  9. Manual Tasks
  10. Pre-inspect System, Harnesses, Lifting Equipment & Anchor Points
  11. Test Anchor Points
  12. Removing & Replacing Cladding using a Rope System
  13. Dismantling
  14. On Completion
  15. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View