null

Tile Sealing Safe Work Method Statement

Product SKU: 10575-2

Heavily Tiled bathroom interior
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Tile Sealing Safe Work Method Statement

This Tile Sealing Safe Work Method Statement (SWMS) covers hazards and controls associated with sealing tiles.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Tile Sealing SWMS: 

(includes potential hazards & control measures).

  1. Working Outdoors
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Working at Height on Ladders, Trestles, Mobile Scaffold & Fixed Scaffold
  8. Surface Preparation & Sealant Application
  9. On Completion
  10. Emergency Response
Write a Review
$89.95
Custom branding available 76BAA198-9788-4A00-A3E8-BC847155F144
  • Personalise your documents with custom branding
  • Custom branding adds your business name, address, ABN and logo where required to the documents in your order
  • $9.95 per cart (no matter how many products are in your order)
  • Upload your details at cart
  • Receive your branded documents shortly after payment

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Tile Sealing Safe Work Method Statement

    This Tile Sealing Safe Work Method Statement (SWMS) covers hazards and controls associated with sealing tiles.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Involves a risk of a person falling from 2m or more, including work on telecommunications towers
    • Work in an area that may have a contaminated or flammable atmosphere

    Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Tile Sealing SWMS: 

    (includes potential hazards & control measures).

    1. Working Outdoors
    2. Arrival On-site & Assess On-site Conditions
    3. Work Area Set-up
    4. Environment
    5. Housekeeping
    6. Manual Tasks
    7. Working at Height on Ladders, Trestles, Mobile Scaffold & Fixed Scaffold
    8. Surface Preparation & Sealant Application
    9. On Completion
    10. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials