Solar Panel Installation Safe Work Method Statement

Product SKU: 10054-6

Person on roof wearing PPE installing solar panels
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Solar Installation Safe Work Method Statement

This Solar Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the installation of solar panels on a roof.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Asbestos disturbance
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Solar Panel Installation Risk Assessment

Before starting any work on a solar panel installation, it's important to complete a risk assessment.

The supplied risk matrix will help identify potential hazards and risks associated with the work that needs to be done. This information can then be used to create  or modify controls to keep everyone safe while working on the installation.

Bonus Working at Height Risk Assessment Checklist included with this SWMS and FREE Legislation & Codes of Practice Reference List

 

Job Steps Covered in Solar Installation SWMS:

(includes potential hazards & control measures)

  1. Implement a Falls Emergency Rescue Plan
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Working Outdoors
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Inverter/Isolator Installation
  9. Accessing the Roof using Mobile Scaffolding or Extension Ladder
  10. Installing Mounting Rails & Panels
  11. Wiring Panels
  12. Lead-acid Bank Battery Installation
  13. Hand & Power Tool Use
  14. Hazardous Chemical Use, (e.g. silicone, cleaning solutions)
  15. Test & Commission
  16. On Completion
  17. Emergency Response
Write a Review
$89.95
Custom branding available 76BAA198-9788-4A00-A3E8-BC847155F144
  • Personalise your documents with custom branding
  • Custom branding adds your business name, address, ABN and logo where required to the documents in your order
  • $9.95 per cart (no matter how many products are in your order)
  • Upload your details at cart
  • Receive your branded documents shortly after payment

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Solar Installation Safe Work Method Statement

    This Solar Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the installation of solar panels on a roof.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Asbestos disturbance
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Involves a risk of a person falling from 2m or more, including work on telecommunications towers
    • Work in an area that may have a contaminated or flammable atmosphere

    Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

    Solar Panel Installation Risk Assessment

    Before starting any work on a solar panel installation, it's important to complete a risk assessment.

    The supplied risk matrix will help identify potential hazards and risks associated with the work that needs to be done. This information can then be used to create  or modify controls to keep everyone safe while working on the installation.

    Bonus Working at Height Risk Assessment Checklist included with this SWMS and FREE Legislation & Codes of Practice Reference List

     

    Job Steps Covered in Solar Installation SWMS:

    (includes potential hazards & control measures)

    1. Implement a Falls Emergency Rescue Plan
    2. Arrival On-site & Assess On-site Conditions
    3. Work Area Set-up
    4. Working Outdoors
    5. Environment
    6. Housekeeping
    7. Manual Tasks
    8. Inverter/Isolator Installation
    9. Accessing the Roof using Mobile Scaffolding or Extension Ladder
    10. Installing Mounting Rails & Panels
    11. Wiring Panels
    12. Lead-acid Bank Battery Installation
    13. Hand & Power Tool Use
    14. Hazardous Chemical Use, (e.g. silicone, cleaning solutions)
    15. Test & Commission
    16. On Completion
    17. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials