Rail Corridor Safe Work Method Statement
This Rail Corridor Safe Work Method Statement (SWMS) covers hazards and controls associated with the preparation, planning and conduct of work in a rail corridor.
This SWMS is intended for use as an attachment, to be used in addition to the relevant SWMS for the specific work being conducted in a rail corridor.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Work carried out adjacent to a road, railway or shipping lane, traffic corridor
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.
Job Steps Covered in Rail Corridor SWMS:
(includes potential hazards & control measures)
- Training
- Planning
- Working Outdoors
- Arrival On-site & Assess On-site Conditions
- Work Area Set-up
- Housekeeping
- Manual Tasks
- Materials Delivery
- Working with Powered & Non-powered Tools
- Hazardous Substance/Chemical Use
- Working & Delivery of Materials & Equipment
- Working Roadside (crossings etc.)
- Hazardous Atmospheres/Materials
- On Completion
- Emergency Response
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Rail Corridor Safe Work Method Statement
This Rail Corridor Safe Work Method Statement (SWMS) covers hazards and controls associated with the preparation, planning and conduct of work in a rail corridor.
This SWMS is intended for use as an attachment, to be used in addition to the relevant SWMS for the specific work being conducted in a rail corridor.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Work carried out adjacent to a road, railway or shipping lane, traffic corridor
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.
Job Steps Covered in Rail Corridor SWMS:
(includes potential hazards & control measures)
- Training
- Planning
- Working Outdoors
- Arrival On-site & Assess On-site Conditions
- Work Area Set-up
- Housekeeping
- Manual Tasks
- Materials Delivery
- Working with Powered & Non-powered Tools
- Hazardous Substance/Chemical Use
- Working & Delivery of Materials & Equipment
- Working Roadside (crossings etc.)
- Hazardous Atmospheres/Materials
- On Completion
- Emergency Response