null

Rail Corridor Safe Work Method Statement

Product SKU: 10589-3

Man in high vis vest & safety glasses looking over a checklist with a train in the background.
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Rail Corridor Safe Work Method Statement

This Rail Corridor Safe Work Method Statement (SWMS) covers hazards and controls associated with the preparation, planning and conduct of work in a rail corridor.

This SWMS is intended for use as an attachment, to be used in addition to the relevant SWMS for the specific work being conducted in a rail corridor.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Rail Corridor SWMS:

(includes potential hazards & control measures)

  1. Training
  2. Planning
  3. Working Outdoors
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Housekeeping
  7. Manual Tasks
  8. Materials Delivery
  9. Working with Powered & Non-powered Tools
  10. Hazardous Substance/Chemical Use
  11. Working & Delivery of Materials & Equipment
  12. Working Roadside (crossings etc.)
  13. Hazardous Atmospheres/Materials
  14. On Completion
  15. Emergency Response
Write a Review
$89.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Rail Corridor Safe Work Method Statement

    This Rail Corridor Safe Work Method Statement (SWMS) covers hazards and controls associated with the preparation, planning and conduct of work in a rail corridor.

    This SWMS is intended for use as an attachment, to be used in addition to the relevant SWMS for the specific work being conducted in a rail corridor.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

    Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Rail Corridor SWMS:

    (includes potential hazards & control measures)

    1. Training
    2. Planning
    3. Working Outdoors
    4. Arrival On-site & Assess On-site Conditions
    5. Work Area Set-up
    6. Housekeeping
    7. Manual Tasks
    8. Materials Delivery
    9. Working with Powered & Non-powered Tools
    10. Hazardous Substance/Chemical Use
    11. Working & Delivery of Materials & Equipment
    12. Working Roadside (crossings etc.)
    13. Hazardous Atmospheres/Materials
    14. On Completion
    15. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials

You may also need