null

Port-a-loo Service Safe Work Method Statement

Product SKU: 10346-6

Port-a-loo
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Port-a-loo Service Safe Work Method Statement

This Port-a-loo Safe Work Method Statement (SWMS) covers hazards and controls associated with the servicing of a port-a-loo.

This SWMS includes cleaning, pump-out of the sewage storage tank and the addition of cleaning/deodorising chemicals to the toilet tank.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement

Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Port-a-loo Service SWMS:

(includes potential hazards & control measures)

  1. Planning
  2. Working Outdoors
  3. Travel To/From/Between Sites
  4. Arrival On-site & Assess On-site Conditions
  5. Environment
  6. Service Operation
  7. On Completion
  8. Emergency Response
Write a Review
$89.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Port-a-loo Service Safe Work Method Statement

    This Port-a-loo Safe Work Method Statement (SWMS) covers hazards and controls associated with the servicing of a port-a-loo.

    This SWMS includes cleaning, pump-out of the sewage storage tank and the addition of cleaning/deodorising chemicals to the toilet tank.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement

    Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Port-a-loo Service SWMS:

    (includes potential hazards & control measures)

    1. Planning
    2. Working Outdoors
    3. Travel To/From/Between Sites
    4. Arrival On-site & Assess On-site Conditions
    5. Environment
    6. Service Operation
    7. On Completion
    8. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials

You may also need