Pit Cover Raising Safe Work Method Statement

This Pit Cover Raising Safe Work Method Statement (SWMS) covers hazards and controls associated with the installation/raising of Sewer Pit Covers, Storm Water Pit Cover & Water Valve Covers.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Pit Cover Raising SWMS:

(includes potential hazards and control measures)

  1. Provide Training on the Health Effects associated with RCS
  2. Planning
  3. Arrival On-site & Assess On-site Conditions
  4. Working Outdoors
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Removing & Replacing Covers
  10. Working with Powered & Non-powered Tools
  11. Cutting & Removal of Asphalt/Concrete
  12. Setting Covers
  13. Fuelling On-site
  14. On Completion
  15. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Pit Cover Raising Safe Work Method Statement

This Pit Cover Raising Safe Work Method Statement (SWMS) covers hazards and controls associated with the installation/raising of Sewer Pit Covers, Storm Water Pit Cover & Water Valve Covers.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Pit Cover Raising SWMS:

(includes potential hazards and control measures)

  1. Provide Training on the Health Effects associated with RCS
  2. Planning
  3. Arrival On-site & Assess On-site Conditions
  4. Working Outdoors
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Removing & Replacing Covers
  10. Working with Powered & Non-powered Tools
  11. Cutting & Removal of Asphalt/Concrete
  12. Setting Covers
  13. Fuelling On-site
  14. On Completion
  15. Emergency Response
PDF Download
PDF File

You May Also Need

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View

OHS/WHS Management Systems FAQ's. View

Quality Management System (QMS) FAQ's. View

New Zealand FAQ's. View

Custom Branding FAQ's. View