Pit Cover Raising Safe Work Method Statement
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Pit Cover Raising Safe Work Method Statement
This Pit Cover Raising Safe Work Method Statement (SWMS) covers hazards and controls associated with the installation/raising of Sewer Pit Covers, Storm Water Pit Cover & Water Valve Covers.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Mobile plant movement
- Work in an area that may have a contaminated or flammable atmosphere
- Work carried out adjacent to a road, railway or shipping lane, traffic corridor
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.
Job Steps Covered in Pit Cover Raising SWMS:
(includes potential hazards and control measures)
- Provide Training on the Health Effects associated with RCS
- Planning
- Arrival On-site & Assess On-site Conditions
- Working Outdoors
- Work Area Set-up
- Environment
- Housekeeping
- Manual Tasks
- Removing & Replacing Covers
- Working with Powered & Non-powered Tools
- Cutting & Removal of Asphalt/Concrete
- Setting Covers
- Fuelling On-site
- On Completion
- Emergency Response
We've recently reviewed and updated our silica dust controls in line with the new 2023 Code of Practice for Silica Dust hazards in the construction industry. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Pit Cover Raising Safe Work Method Statement
This Pit Cover Raising Safe Work Method Statement (SWMS) covers hazards and controls associated with the installation/raising of Sewer Pit Covers, Storm Water Pit Cover & Water Valve Covers.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Mobile plant movement
- Work in an area that may have a contaminated or flammable atmosphere
- Work carried out adjacent to a road, railway or shipping lane, traffic corridor
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.
Job Steps Covered in Pit Cover Raising SWMS:
(includes potential hazards and control measures)
- Provide Training on the Health Effects associated with RCS
- Planning
- Arrival On-site & Assess On-site Conditions
- Working Outdoors
- Work Area Set-up
- Environment
- Housekeeping
- Manual Tasks
- Removing & Replacing Covers
- Working with Powered & Non-powered Tools
- Cutting & Removal of Asphalt/Concrete
- Setting Covers
- Fuelling On-site
- On Completion
- Emergency Response
We've recently reviewed and updated our silica dust controls in line with the new 2023 Code of Practice for Silica Dust hazards in the construction industry. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.