Pit Cover Raising Safe Work Method Statement
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Edit documents on the go with Microsoft Office Mobile App
- Only pay once (no subscriptions required).
Pit Cover Raising Safe Work Method Statement
This Pit Cover Raising Safe Work Method Statement (SWMS) covers hazards and controls associated with the installation/raising of Sewer Pit Covers, Storm Water Pit Cover & Water Valve Covers.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Mobile plant movement
- Work in an area that may have a contaminated or flammable atmosphere
- Work carried out adjacent to a road, railway or shipping lane, traffic corridor
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.
FREE Legislation & Codes of Practice Reference List
Job Steps Covered in Pit Cover Raising SWMS:
(includes potential hazards and control measures)
- Provide Training on the Health Effects associated with RCS
- Planning
- Arrival On-site & Assess On-site Conditions
- Working Outdoors
- Work Area Set-up
- Environment
- Housekeeping
- Manual Tasks
- Removing & Replacing Covers
- Working with Powered & Non-powered Tools
- Cutting & Removal of Asphalt/Concrete
- Setting Covers
- Fuelling On-site
- On Completion
- Emergency Response
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Edit documents on the go with Microsoft Office Mobile App
- Only pay once (no subscriptions required).
Pit Cover Raising Safe Work Method Statement
This Pit Cover Raising Safe Work Method Statement (SWMS) covers hazards and controls associated with the installation/raising of Sewer Pit Covers, Storm Water Pit Cover & Water Valve Covers.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Mobile plant movement
- Work in an area that may have a contaminated or flammable atmosphere
- Work carried out adjacent to a road, railway or shipping lane, traffic corridor
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.
FREE Legislation & Codes of Practice Reference List
Job Steps Covered in Pit Cover Raising SWMS:
(includes potential hazards and control measures)
- Provide Training on the Health Effects associated with RCS
- Planning
- Arrival On-site & Assess On-site Conditions
- Working Outdoors
- Work Area Set-up
- Environment
- Housekeeping
- Manual Tasks
- Removing & Replacing Covers
- Working with Powered & Non-powered Tools
- Cutting & Removal of Asphalt/Concrete
- Setting Covers
- Fuelling On-site
- On Completion
- Emergency Response