null

Get 20% off all documents this World Day for Safety and Health at Work. Use code SAFETY2023 at checkout. TODAY ONLY!*.

Transform your workplace with our NEW Psychosocial Hazard Management Plan. Find out more here.

2 men Erecting Fixed Scaffolding

Erecting Fixed Scaffold Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian and New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Erecting Fixed Scaffold Safe Work Method Statement

This Erecting Fixed Scaffold Safe Work Method Statement (SWMS) covers hazards and controls associated with the erection, dismantling and use of fixed scaffold.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Slips, Trips and Falls, Hazardous Manual Tasks, Outdoor Work and Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Erecting Fixed Scaffold SWMS:

(includes potential hazards and control measures)

  1. Arrival On-site and Assess On-site Conditions
  2. Unloading Scaffolding
  3. Environment
  4. Working Outdoors
  5. Housekeeping
  6. Manual Tasks
  7. Working with Powered and Non-powered Tools
  8. Work Area Set-up and Pre-inspection
  9. Erecting Scaffold
  10. Working on Scaffolding
  11. Handover
  12. Dismantling
  13. On Completion
  14. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian and New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Erecting Fixed Scaffold Safe Work Method Statement

This Erecting Fixed Scaffold Safe Work Method Statement (SWMS) covers hazards and controls associated with the erection, dismantling and use of fixed scaffold.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Slips, Trips and Falls, Hazardous Manual Tasks, Outdoor Work and Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Erecting Fixed Scaffold SWMS:

(includes potential hazards and control measures)

  1. Arrival On-site and Assess On-site Conditions
  2. Unloading Scaffolding
  3. Environment
  4. Working Outdoors
  5. Housekeeping
  6. Manual Tasks
  7. Working with Powered and Non-powered Tools
  8. Work Area Set-up and Pre-inspection
  9. Erecting Scaffold
  10. Working on Scaffolding
  11. Handover
  12. Dismantling
  13. On Completion
  14. Emergency Response
PDF Download
PDF File

You May Also Need

Hear From Our Customers

  • 5

    A-Z of everything we need

    A-Z of everything we need, more than helpful customer service and all questions answered.
    1st class company!

  • 5

    Thorough, correct, east-to-use, great legislative reference attachments and easy to re-badge.

    Thorough, correct, east-to-use, great legislative reference attachments and easy to re-badge.

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View