Erecting Fixed Scaffold Safe Work Method Statement

Product SKU: 10530-4

2 men Erecting Fixed Scaffolding
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian and New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Erecting Fixed Scaffold Safe Work Method Statement

This Erecting Fixed Scaffold Safe Work Method Statement (SWMS) covers hazards and controls associated with the erection, dismantling and use of fixed scaffold.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Slips, Trips and Falls, Hazardous Manual Tasks, Outdoor Work and Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Erecting Fixed Scaffold SWMS:

(includes potential hazards and control measures)

  1. Arrival On-site and Assess On-site Conditions
  2. Unloading Scaffolding
  3. Environment
  4. Working Outdoors
  5. Housekeeping
  6. Manual Tasks
  7. Working with Powered and Non-powered Tools
  8. Work Area Set-up and Pre-inspection
  9. Erecting Scaffold
  10. Working on Scaffolding
  11. Handover
  12. Dismantling
  13. On Completion
  14. Emergency Response
Write a Review
$89.95
Custom branding available 76BAA198-9788-4A00-A3E8-BC847155F144
  • Personalise your documents with custom branding
  • Custom branding adds your business name, address, ABN and logo where required to the documents in your order
  • $9.95 per cart (no matter how many products are in your order)
  • Upload your details at cart
  • Receive your branded documents shortly after payment

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian and New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Erecting Fixed Scaffold Safe Work Method Statement

    This Erecting Fixed Scaffold Safe Work Method Statement (SWMS) covers hazards and controls associated with the erection, dismantling and use of fixed scaffold.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

    Additional controls are included for Electrical Equipment, Slips, Trips and Falls, Hazardous Manual Tasks, Outdoor Work and Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Erecting Fixed Scaffold SWMS:

    (includes potential hazards and control measures)

    1. Arrival On-site and Assess On-site Conditions
    2. Unloading Scaffolding
    3. Environment
    4. Working Outdoors
    5. Housekeeping
    6. Manual Tasks
    7. Working with Powered and Non-powered Tools
    8. Work Area Set-up and Pre-inspection
    9. Erecting Scaffold
    10. Working on Scaffolding
    11. Handover
    12. Dismantling
    13. On Completion
    14. Emergency Response