Timber Floor Laying Safe Work Method Statement
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Timber Floor Laying Safe Work Method Statement
This Timber Floor Laying Safe Work Method Statement (SWMS) covers hazards and controls associated with the installation of timber flooring.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Out-of- Hours/Night Work, Hazardous Manual Tasks, Remotely &/or Isolated Work, Silica Dust & Environmental Considerations.
Timber Floor Laying SWMS:
(includes potential hazards & control measures)
- Out-of-Hours/Night Work
- Working Alone
- Arrival On-site & Assess On-site Conditions
- Work Area Set-up
- Materials Delivery by Truck
- Environment
- Housekeeping
- Working with Powered & Non-powered Tools
- Cutting & Laying Underlay
- Laying Plywood Underlay & Timber Boards
- Using Adhesives
- On Completion
- Emergency response
We've recently reviewed and updated our silica dust controls in line with the new 2023 Code of Practice for Silica Dust hazards in the construction industry. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Timber Floor Laying Safe Work Method Statement
This Timber Floor Laying Safe Work Method Statement (SWMS) covers hazards and controls associated with the installation of timber flooring.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Out-of- Hours/Night Work, Hazardous Manual Tasks, Remotely &/or Isolated Work, Silica Dust & Environmental Considerations.
Timber Floor Laying SWMS:
(includes potential hazards & control measures)
- Out-of-Hours/Night Work
- Working Alone
- Arrival On-site & Assess On-site Conditions
- Work Area Set-up
- Materials Delivery by Truck
- Environment
- Housekeeping
- Working with Powered & Non-powered Tools
- Cutting & Laying Underlay
- Laying Plywood Underlay & Timber Boards
- Using Adhesives
- On Completion
- Emergency response
We've recently reviewed and updated our silica dust controls in line with the new 2023 Code of Practice for Silica Dust hazards in the construction industry. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.