null

Fibre Optic Splicing - Termination Safe Work Method Statement

Product SKU: 10369-5

Fibre optic splicing
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Fibre Optic Splicing - Termination Safe Work Method Statement

This Fibre Optic Splicing - Termination Safe Work Method Statement (SWMS) covers hazards and controls associated with the planning and preparation of the activity and operation involved with repairing, splicing or building a new joint in fibre optic cabling adjacent to roads and, subsequent placement in a pit or manhole.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Asbestos disturbance
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Fibre Optic Splicing - Termination SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Training
  3. Working Outdoors
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Working with Powered & Non-powered Tools
  10. Hazardous Substance/Chemical Use
  11. Manhole/Pit Work
  12. Asbestos Disturbance
  13. Fibre Splicing & Termination
  14. Test & Commission
  15. On Completion
  16. Emergency Response
Write a Review
$89.95
Custom branding available 76BAA198-9788-4A00-A3E8-BC847155F144
  • Personalise your documents with custom branding
  • Custom branding adds your business name, address, ABN and logo where required to the documents in your order
  • $9.95 per cart (no matter how many products are in your order)
  • Upload your details at cart
  • Receive your branded documents shortly after payment

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Fibre Optic Splicing - Termination Safe Work Method Statement

    This Fibre Optic Splicing - Termination Safe Work Method Statement (SWMS) covers hazards and controls associated with the planning and preparation of the activity and operation involved with repairing, splicing or building a new joint in fibre optic cabling adjacent to roads and, subsequent placement in a pit or manhole.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Asbestos disturbance
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Fibre Optic Splicing - Termination SWMS:

    (includes potential hazards and control measures)

    1. Planning
    2. Training
    3. Working Outdoors
    4. Arrival On-site & Assess On-site Conditions
    5. Work Area Set-up
    6. Environment
    7. Housekeeping
    8. Manual Tasks
    9. Working with Powered & Non-powered Tools
    10. Hazardous Substance/Chemical Use
    11. Manhole/Pit Work
    12. Asbestos Disturbance
    13. Fibre Splicing & Termination
    14. Test & Commission
    15. On Completion
    16. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials