null

Cable Hauling Safe Work Method Statement

Product SKU: 10382-6

A large roll of cable tied down, being hauled on the back of a truck.
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Cable Hauling Safe Work Method Statement

This Cable Hauling Safe Work Method Statement (SWMS) covers hazards and controls associated with cable hauling. including adjacent to roads and, working in a pit or manhole.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Cable Hauling SWMS:

(includes potential hazards and control measures)

  1. Training
  2. Planning
  3. Working Outdoors
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Loading/Unloading Equipment, Cable & Materials
  10. Working with Powered & Non-powered Tools
  11. Hazardous Substance/Chemical Use
  12. Access Maintenance Hole/Pit
  13. Blowing Rope/Rod
  14. Pulling Cable
  15. On Completion
  16. Emergency Response
Write a Review
$89.95
Custom branding available 76BAA198-9788-4A00-A3E8-BC847155F144
  • Personalise your documents with custom branding
  • Custom branding adds your business name, address, ABN and logo where required to the documents in your order
  • $9.95 per cart (no matter how many products are in your order)
  • Upload your details at cart
  • Receive your branded documents shortly after payment

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Cable Hauling Safe Work Method Statement

    This Cable Hauling Safe Work Method Statement (SWMS) covers hazards and controls associated with cable hauling. including adjacent to roads and, working in a pit or manhole.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Work in an area that may have a contaminated or flammable atmosphere

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Cable Hauling SWMS:

    (includes potential hazards and control measures)

    1. Training
    2. Planning
    3. Working Outdoors
    4. Arrival On-site & Assess On-site Conditions
    5. Work Area Set-up
    6. Environment
    7. Housekeeping
    8. Manual Tasks
    9. Loading/Unloading Equipment, Cable & Materials
    10. Working with Powered & Non-powered Tools
    11. Hazardous Substance/Chemical Use
    12. Access Maintenance Hole/Pit
    13. Blowing Rope/Rod
    14. Pulling Cable
    15. On Completion
    16. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials