null

Electrical Temporary Connections Safe Work Method Statement

Product SKU: 10567-3

Electrical box and wiring
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Electrical Temporary Connections Safe Work Method Statement

This Electrical Temporary Connections Safe Work Method Statement (SWMS) covers hazards and controls associated with the electrical fit-out for live entertainment and events.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Electrical Temporary Connections SWMS:

(includes potential hazards and control measures)

  1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
  2. Working Outdoors
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Working with Powered & Non-powered Tools
  9. Hazardous Substance/Chemical Use
  10. Working at Height on Ladders, Trestles, & Mobile Scaffold
  11. Working On or Near Energised Electrical Installations or Services
  12. Running Leads & Setting-up Equipment
  13. On Completion
  14. Emergency Response
Write a Review
$89.95
Custom branding available 76BAA198-9788-4A00-A3E8-BC847155F144
  • Personalise your documents with custom branding
  • Custom branding adds your business name, address, ABN and logo where required to the documents in your order
  • $9.95 per cart (no matter how many products are in your order)
  • Upload your details at cart
  • Receive your branded documents shortly after payment

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Electrical Temporary Connections Safe Work Method Statement

    This Electrical Temporary Connections Safe Work Method Statement (SWMS) covers hazards and controls associated with the electrical fit-out for live entertainment and events.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Electrical Temporary Connections SWMS:

    (includes potential hazards and control measures)

    1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
    2. Working Outdoors
    3. Arrival On-site & Assess On-site Conditions
    4. Work Area Set-up
    5. Environment
    6. Housekeeping
    7. Manual Tasks
    8. Working with Powered & Non-powered Tools
    9. Hazardous Substance/Chemical Use
    10. Working at Height on Ladders, Trestles, & Mobile Scaffold
    11. Working On or Near Energised Electrical Installations or Services
    12. Running Leads & Setting-up Equipment
    13. On Completion
    14. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials