Cable Ladder Tray-Conduit Installation Safe Work Method Statement
This Cable Ladder Tray-Conduit Installation Safe Work Method Statement (SWMS) covers hazards and controls when installing cable ladders, trays and conduits.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hot Work, Hazardous Manual Tasks, Silica Dust & Environmental Considerations.
FREE Legislation & Codes of Practice Reference List
Job Steps Covered in Cable Ladder Tray-Conduit Installation SWMS:
(includes potential hazards and control measures)
- Arrival On-site, Site Assessment & Unloading of Materials/Equipment
- Work Area Set-up
- Locate & Isolate Existing Services
- Environment
- Housekeeping
- Manual Tasks
- Working with Powered & Non-powered Tools
- Hazardous Substance/Chemical Use
- Working at Height on Ladders, Trestles & Mobile Scaffold
- Securing Fixings, Supports, Fitting Trays, Ladders & Conduit
- On Completion
- Emergency Response
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Edit documents on the go with Microsoft Office Mobile App
- Only pay once (no subscriptions required).
Cable Ladder Tray-Conduit Installation Safe Work Method Statement
This Cable Ladder Tray-Conduit Installation Safe Work Method Statement (SWMS) covers hazards and controls when installing cable ladders, trays and conduits.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hot Work, Hazardous Manual Tasks, Silica Dust & Environmental Considerations.
FREE Legislation & Codes of Practice Reference List
Job Steps Covered in Cable Ladder Tray-Conduit Installation SWMS:
(includes potential hazards and control measures)
- Arrival On-site, Site Assessment & Unloading of Materials/Equipment
- Work Area Set-up
- Locate & Isolate Existing Services
- Environment
- Housekeeping
- Manual Tasks
- Working with Powered & Non-powered Tools
- Hazardous Substance/Chemical Use
- Working at Height on Ladders, Trestles & Mobile Scaffold
- Securing Fixings, Supports, Fitting Trays, Ladders & Conduit
- On Completion
- Emergency Response