Drilling and Piling Safe Work Method Statement
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Edit documents on the go with Microsoft Office Mobile App
- Only pay once (no subscriptions required).
Drilling and Piling Safe Work Method Statement
This Drilling and Piling Safe Work Method Statement (SWMS) covers hazards and controls associated with conducting drilling and piling operations with the use of an excavator based midi drill.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Work in an area that may have a contaminated or flammable atmosphere
- Work carried out adjacent to a road, railway or shipping lane, traffic corridor
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.
FREE Legislation & Codes of Practice Reference List
Job Steps Covered in Drilling and Piling SWMS:
(includes potential hazards and control measures)
- Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
- Working Outdoors
- Arrival On-site & Assess On-site Conditions
- Delivery & Removal of Drill Rig
- Work Area Set-up
- Environment
- Housekeeping
- Manual Tasks
- Hazardous Substance/Chemical Use
- Drilling & Piling
- Lifting Operations
- Winch Operation
- Changing Attachments
- Maintenance On-site
- Fuelling On-site
- On Completion
- Emergency Response
We've recently reviewed and updated our silica dust controls in line with the new 2023 Code of Practice for Silica Dust hazards in the construction industry. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Edit documents on the go with Microsoft Office Mobile App
- Only pay once (no subscriptions required).
Drilling and Piling Safe Work Method Statement
This Drilling and Piling Safe Work Method Statement (SWMS) covers hazards and controls associated with conducting drilling and piling operations with the use of an excavator based midi drill.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Work in an area that may have a contaminated or flammable atmosphere
- Work carried out adjacent to a road, railway or shipping lane, traffic corridor
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.
FREE Legislation & Codes of Practice Reference List
Job Steps Covered in Drilling and Piling SWMS:
(includes potential hazards and control measures)
- Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
- Working Outdoors
- Arrival On-site & Assess On-site Conditions
- Delivery & Removal of Drill Rig
- Work Area Set-up
- Environment
- Housekeeping
- Manual Tasks
- Hazardous Substance/Chemical Use
- Drilling & Piling
- Lifting Operations
- Winch Operation
- Changing Attachments
- Maintenance On-site
- Fuelling On-site
- On Completion
- Emergency Response
We've recently reviewed and updated our silica dust controls in line with the new 2023 Code of Practice for Silica Dust hazards in the construction industry. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.