Drilling and Piling Safe Work Method Statement

This Drilling and Piling Safe Work Method Statement (SWMS) covers hazards and controls associated with conducting drilling and piling operations with the use of an excavator based midi drill.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Drilling and Piling SWMS:

(includes potential hazards and control measures)

  1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
  2. Working Outdoors
  3. Arrival On-site & Assess On-site Conditions
  4. Delivery & Removal of Drill Rig
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Hazardous Substance/Chemical Use
  10. Drilling & Piling
  11. Lifting Operations
  12. Winch Operation
  13. Changing Attachments
  14. Maintenance On-site
  15. Fuelling On-site
  16. On Completion
  17. Emergency Response
Write a Review
$89.95
Custom branding available 76BAA198-9788-4A00-A3E8-BC847155F144
  • Personalise your documents with custom branding
  • Custom branding adds your business name, address, ABN and logo where required to the documents in your order
  • $9.95 per cart (no matter how many products are in your order)
  • Upload your details at cart
  • Receive your branded documents shortly after payment

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Drilling and Piling Safe Work Method Statement

    This Drilling and Piling Safe Work Method Statement (SWMS) covers hazards and controls associated with conducting drilling and piling operations with the use of an excavator based midi drill.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Work in an area that may have a contaminated or flammable atmosphere
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

    Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Drilling and Piling SWMS:

    (includes potential hazards and control measures)

    1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
    2. Working Outdoors
    3. Arrival On-site & Assess On-site Conditions
    4. Delivery & Removal of Drill Rig
    5. Work Area Set-up
    6. Environment
    7. Housekeeping
    8. Manual Tasks
    9. Hazardous Substance/Chemical Use
    10. Drilling & Piling
    11. Lifting Operations
    12. Winch Operation
    13. Changing Attachments
    14. Maintenance On-site
    15. Fuelling On-site
    16. On Completion
    17. Emergency Response