null

Concrete Steel Fixing Safe Work Method Statement

Product SKU: 10254-7

Man wearing PPE securing steel bars together with construction wire.
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Concrete Steel Fixing Safe Work Method Statement

This Concrete Steel Fixing Safe Work Method Statement (SWMS) covers hazards and controls associated with guidance on steel fixing including setting and tying steel reinforcing bar for concrete construction.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Risk Assessment for Steel Fixing

Each SWMS contains a  risk assessment matrix to help you identify and mitigate risks on site

Our comprehensive document includes risk ratings for setting and tying steel reinforcing bars for concrete construction, so you can work safely and efficiently.

 Keep your team protected with our expert advice!

Comes with FREE Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Concrete Steel Fixing SWMS:

(includes potential hazards and control measures)

  1. Arrival On-site & Assess On-site Conditions
  2. Work Area Set-up
  3. Environment
  4. Working Outdoors
  5. Housekeeping
  6. Manual Tasks
  7. Working with Powered & Non-powered Tools
  8. Hazardous Substance/Chemical Use
  9. Materials Delivery
  10. Lifting Reo Bar/Mesh with Crane
  11. Electric & Manual Reinforcing Bar Cutters/Benders
  12. Using Oxy–acetylene Equipment
  13. Steel Fixing
  14. On Completion
  15. Emergency Response

View Document Sample

Write a Review
$89.95
Custom branding available 76BAA198-9788-4A00-A3E8-BC847155F144
  • Personalise your documents with custom branding
  • Custom branding adds your business name, address, ABN and logo where required to the documents in your order
  • $9.95 per cart (no matter how many products are in your order)
  • Upload your details at cart
  • Receive your branded documents shortly after payment

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Concrete Steel Fixing Safe Work Method Statement

    This Concrete Steel Fixing Safe Work Method Statement (SWMS) covers hazards and controls associated with guidance on steel fixing including setting and tying steel reinforcing bar for concrete construction.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

    Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

    Risk Assessment for Steel Fixing

    Each SWMS contains a  risk assessment matrix to help you identify and mitigate risks on site

    Our comprehensive document includes risk ratings for setting and tying steel reinforcing bars for concrete construction, so you can work safely and efficiently.

     Keep your team protected with our expert advice!

    Comes with FREE Legislation & Codes of Practice Reference List valued at $19.95

    Job Steps Covered in Concrete Steel Fixing SWMS:

    (includes potential hazards and control measures)

    1. Arrival On-site & Assess On-site Conditions
    2. Work Area Set-up
    3. Environment
    4. Working Outdoors
    5. Housekeeping
    6. Manual Tasks
    7. Working with Powered & Non-powered Tools
    8. Hazardous Substance/Chemical Use
    9. Materials Delivery
    10. Lifting Reo Bar/Mesh with Crane
    11. Electric & Manual Reinforcing Bar Cutters/Benders
    12. Using Oxy–acetylene Equipment
    13. Steel Fixing
    14. On Completion
    15. Emergency Response

    View Document Sample

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials