Concrete Waffle Pod Raft System Safe Work Method Statement
This Concrete Waffle Pod Raft System Safe Work Method Statement (SWMS) covers hazards and controls, associated with handling, delivery and placement of wet concrete being placed into a waffle pod raft system.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.
Job Steps Concrete Waffle Pod Raft System SWMS:
(includes potential hazards and control measures)
- Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
- Working Outdoors
- Arrival On-site & Assess On-site Conditions
- Work Area Set-up
- Environment
- Housekeeping
- Manual Tasks
- Delivering Materials, Subgrade Preparation, Concrete Delivery
- Working with Powered & Non-powered Tools
- Setting-out/Profiling Building Lines
- Subgrade Preparation
- Waffle Pod Placement
- Setting Steel & Formwork
- Placing Concrete & Finish
- Fuelling Small Engines On-site
- On Completion
- Emergency Response
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Edit documents on the go with Microsoft Office Mobile App
- Only pay once (no subscriptions required).
Concrete Waffle Pod Raft System Safe Work Method Statement
This Concrete Waffle Pod Raft System Safe Work Method Statement (SWMS) covers hazards and controls, associated with handling, delivery and placement of wet concrete being placed into a waffle pod raft system.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.
Job Steps Concrete Waffle Pod Raft System SWMS:
(includes potential hazards and control measures)
- Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
- Working Outdoors
- Arrival On-site & Assess On-site Conditions
- Work Area Set-up
- Environment
- Housekeeping
- Manual Tasks
- Delivering Materials, Subgrade Preparation, Concrete Delivery
- Working with Powered & Non-powered Tools
- Setting-out/Profiling Building Lines
- Subgrade Preparation
- Waffle Pod Placement
- Setting Steel & Formwork
- Placing Concrete & Finish
- Fuelling Small Engines On-site
- On Completion
- Emergency Response