null

Concrete Boom or Line Pumping Safe Work Method Statement

Product SKU: 10065-7

A construction site with an orange concrete pump, a person holding the boom line in position
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Concrete Boom or Line Pumping Safe Work Method Statement

This Concrete Boom or Line Pumping Safe Work Method Statement (SWMS) covers hazards and controls associated with the operation of truck mounted concrete boom and line pumps.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Concrete Pump Risk Assessment

Concrete boom and line pumps can be dangerous equipment if not operated safely. That's why all of our Safe Work Method Statements include a Risk Assessment matrix.

This document is tailored specifically for your industry, so you can rate your risk right in the SWMS  and ensure you're meeting all safety requirements.

With SafetyDocs SWMS, you can rest assured that your crew is working with the utmost safety in mind.

Comes with FREE Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Concrete Boom or Line Pumping SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Road Operation
  3. Working Outdoors
  4. Arrival On-site & Assess On-site Conditions
  5. Pump/Line/Boom Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Working Near Powered Mobile Plant
  10. Hazardous Substance/Chemical Use (e.g. cement powder, hydrochloric acid, & diesel fuel)
  11. Concrete Pour
  12. Clearing Line Blockages
  13. Cleaning Out Pump Lines with Compressed Air
  14. On Completion
  15. Emergency Response
Write a Review
$89.95
Custom branding available 76BAA198-9788-4A00-A3E8-BC847155F144
  • Personalise your documents with custom branding
  • Custom branding adds your business name, address, ABN and logo where required to the documents in your order
  • $9.95 per cart (no matter how many products are in your order)
  • Upload your details at cart
  • Receive your branded documents shortly after payment

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Concrete Boom or Line Pumping Safe Work Method Statement

    This Concrete Boom or Line Pumping Safe Work Method Statement (SWMS) covers hazards and controls associated with the operation of truck mounted concrete boom and line pumps.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Work in an area that may have a contaminated or flammable atmosphere
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

    Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

    Concrete Pump Risk Assessment

    Concrete boom and line pumps can be dangerous equipment if not operated safely. That's why all of our Safe Work Method Statements include a Risk Assessment matrix.

    This document is tailored specifically for your industry, so you can rate your risk right in the SWMS  and ensure you're meeting all safety requirements.

    With SafetyDocs SWMS, you can rest assured that your crew is working with the utmost safety in mind.

    Comes with FREE Legislation & Codes of Practice Reference List valued at $19.95

    Job Steps Covered in Concrete Boom or Line Pumping SWMS:

    (includes potential hazards and control measures)

    1. Planning
    2. Road Operation
    3. Working Outdoors
    4. Arrival On-site & Assess On-site Conditions
    5. Pump/Line/Boom Set-up
    6. Environment
    7. Housekeeping
    8. Manual Tasks
    9. Working Near Powered Mobile Plant
    10. Hazardous Substance/Chemical Use (e.g. cement powder, hydrochloric acid, & diesel fuel)
    11. Concrete Pour
    12. Clearing Line Blockages
    13. Cleaning Out Pump Lines with Compressed Air
    14. On Completion
    15. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials