null

Get 20% off all documents this World Day for Safety and Health at Work. Use code SAFETY2023 at checkout. TODAY ONLY!*.

Transform your workplace with our NEW Psychosocial Hazard Management Plan. Find out more here.

Worker using a mop in a large open space

Final Building Clean Before Handover to Client Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Final Building Clean Before Handover to Client Safe Work Method Statement

This Final Building Clean Before Handover to Client Safe Work Method Statement (SWMS) covers hazards and controls associated with the cleaning of a residential or commercial building at the end of construction before final hand-over to client.

This SWMS covers the potential job steps, hazards and control measures associated with final building cleans.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Final Building Clean Before Handover to Client SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Working Outdoors
  6. Working Near Powered Mobile Plant
  7. Working at Elevated Levels
  8. Cleaning
  9. On Completion
  10. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Final Building Clean Before Handover to Client Safe Work Method Statement

This Final Building Clean Before Handover to Client Safe Work Method Statement (SWMS) covers hazards and controls associated with the cleaning of a residential or commercial building at the end of construction before final hand-over to client.

This SWMS covers the potential job steps, hazards and control measures associated with final building cleans.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Final Building Clean Before Handover to Client SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Working Outdoors
  6. Working Near Powered Mobile Plant
  7. Working at Elevated Levels
  8. Cleaning
  9. On Completion
  10. Emergency Response
PDF Download
PDF File

You May Also Need

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View