null
Men wearing hardhats and protective clothing, doing work on Swing Stage.

Cladding Removal-Installation Swing Stage Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Cladding Removal-Installation Swing Stage Safe Work Method Statement

This Cladding Removal-Installation Swing Stage Safe Work Method Statement (SWMS) covers hazards and controls associated with the use of suspended scaffold systems to remove and install insulation, sarking & cladding.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Cladding Removal-Installation Swing Stage SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Implement a Falls Emergency Rescue Plan
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Materials & Waste Delivery & Removal
  6. Working Outdoors
  7. Environment
  8. Housekeeping
  9. Manual Tasks
  10. Pre-inspect System
  11. Removing & Replacing Cladding using a Rope System
  12. On Completion
  13. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Cladding Removal-Installation Swing Stage Safe Work Method Statement

This Cladding Removal-Installation Swing Stage Safe Work Method Statement (SWMS) covers hazards and controls associated with the use of suspended scaffold systems to remove and install insulation, sarking & cladding.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Cladding Removal-Installation Swing Stage SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Implement a Falls Emergency Rescue Plan
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Materials & Waste Delivery & Removal
  6. Working Outdoors
  7. Environment
  8. Housekeeping
  9. Manual Tasks
  10. Pre-inspect System
  11. Removing & Replacing Cladding using a Rope System
  12. On Completion
  13. Emergency Response
PDF Download
PDF File

You May Also Need

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View

OHS/WHS Management Systems FAQ's. View

Quality Management System (QMS) FAQ's. View

New Zealand FAQ's. View

Custom Branding FAQ's. View