Cladding Removal-Installation Swing Stage Safe Work Method Statement
This Cladding Removal-Installation Swing Stage Safe Work Method Statement (SWMS) covers hazards and controls associated with the use of suspended scaffold systems to remove and install insulation, sarking & cladding.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Involves a risk of a person falling from 2m or more, including work on telecommunications towers
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.
Job Steps Covered in Cladding Removal-Installation Swing Stage SWMS:
(includes potential hazards and control measures)
- Planning
- Implement a Falls Emergency Rescue Plan
- Arrival On-site & Assess On-site Conditions
- Work Area Set-up
- Materials & Waste Delivery & Removal
- Working Outdoors
- Environment
- Housekeeping
- Manual Tasks
- Pre-inspect System
- Removing & Replacing Cladding using a Rope System
- On Completion
- Emergency Response
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Edit documents on the go with Microsoft Office Mobile App
- Only pay once (no subscriptions required).
Cladding Removal-Installation Swing Stage Safe Work Method Statement
This Cladding Removal-Installation Swing Stage Safe Work Method Statement (SWMS) covers hazards and controls associated with the use of suspended scaffold systems to remove and install insulation, sarking & cladding.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Involves a risk of a person falling from 2m or more, including work on telecommunications towers
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.
Job Steps Covered in Cladding Removal-Installation Swing Stage SWMS:
(includes potential hazards and control measures)
- Planning
- Implement a Falls Emergency Rescue Plan
- Arrival On-site & Assess On-site Conditions
- Work Area Set-up
- Materials & Waste Delivery & Removal
- Working Outdoors
- Environment
- Housekeeping
- Manual Tasks
- Pre-inspect System
- Removing & Replacing Cladding using a Rope System
- On Completion
- Emergency Response