Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Workers working on mobile scaffold on site

Mobile Scaffold Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Mobile Scaffold Safe Work Method Statement

This Mobile Scaffold Safe Work Method Statement (SWMS) outlines the general safety steps, general hazards and controls associated with the erection, dismantling and use of mobile scaffold. 

This SWMS does not cover the specific setup of height access equipment.

Unless otherwise mentioned in this SWMS a separate, dedicated SWMS will be required for the set-up/erection of height access equipment such as Mobile Elevated Work Platforms etc.

Job Steps Covered in Mobile Scaffold SWMS:

(includes potential hazards & control measures)

  1. Training
  2. Planning
  3. Manual Handling
  4. Transporting mobile scaffolding
  5. Arrival on-site & assess on-site conditions
  6. Erecting Scaffold
  7. Working on mobile scaffolds
  8. Moving mobile scaffold
  9. Breaking down the scaffold
  10. Emergency response
  11. Incident management
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Mobile Scaffold Safe Work Method Statement

This Mobile Scaffold Safe Work Method Statement (SWMS) outlines the general safety steps, general hazards and controls associated with the erection, dismantling and use of mobile scaffold. 

This SWMS does not cover the specific setup of height access equipment.

Unless otherwise mentioned in this SWMS a separate, dedicated SWMS will be required for the set-up/erection of height access equipment such as Mobile Elevated Work Platforms etc.

Job Steps Covered in Mobile Scaffold SWMS:

(includes potential hazards & control measures)

  1. Training
  2. Planning
  3. Manual Handling
  4. Transporting mobile scaffolding
  5. Arrival on-site & assess on-site conditions
  6. Erecting Scaffold
  7. Working on mobile scaffolds
  8. Moving mobile scaffold
  9. Breaking down the scaffold
  10. Emergency response
  11. Incident management
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View