null

Static Security Guard-Patrol Safe Work Method Statement

Product SKU: 10627-2

Security guard holding walkie talkie
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Static Security Guard-Patrol Safe Work Method Statement

This Static Security Guard-Patrol Safe Work Method Statement (SWMS) covers hazards and controls associated with security static/patrol guard activities at sites where the general public are present such as shopping centres.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement

Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Static Security Guard-Patrol SWMS:

(includes potential hazards & control measures)

  1. Working Outdoors
  2. Night Work
  3. Shift Work
  4. Working Alone
  5. Training in the Use of Equipment
  6. Arrival On-site & Assess On-site Conditions
  7. Patrolling
  8. Observation by CCTV
  9. Vehicle Patrol
  10. Accidents/Breakdowns
  11. Repairs (i.e. tyre changes)
  12. Fuelling
  13. On Completion
  14. Emergency Response
Write a Review
$89.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Static Security Guard-Patrol Safe Work Method Statement

    This Static Security Guard-Patrol Safe Work Method Statement (SWMS) covers hazards and controls associated with security static/patrol guard activities at sites where the general public are present such as shopping centres.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement

    Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Static Security Guard-Patrol SWMS:

    (includes potential hazards & control measures)

    1. Working Outdoors
    2. Night Work
    3. Shift Work
    4. Working Alone
    5. Training in the Use of Equipment
    6. Arrival On-site & Assess On-site Conditions
    7. Patrolling
    8. Observation by CCTV
    9. Vehicle Patrol
    10. Accidents/Breakdowns
    11. Repairs (i.e. tyre changes)
    12. Fuelling
    13. On Completion
    14. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials