Chain Trencher Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Chain Trencher Safe Work Method Statement

This Chain Trencher Safe Work Method Statement (SWMS) covers hazards and controls with the view of ensuring that all reasonably practicable steps have been taken to prevent the likelihood of incident during the operation of a chain trencher associated with excavations.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work, Remotely &/or Isolated Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Chain Trencher SWMS:

  1. Working Outdoors
  2. Working Alone
  3. Transporting the Trencher
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Establish a Communication System with Ground Workers
  10. Trencher Operation
  11. Changing Attachments
  12. Refuelling
  13. On Completion
  14. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Chain Trencher Safe Work Method Statement

This Chain Trencher Safe Work Method Statement (SWMS) covers hazards and controls with the view of ensuring that all reasonably practicable steps have been taken to prevent the likelihood of incident during the operation of a chain trencher associated with excavations.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work, Remotely &/or Isolated Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Chain Trencher SWMS:

  1. Working Outdoors
  2. Working Alone
  3. Transporting the Trencher
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Establish a Communication System with Ground Workers
  10. Trencher Operation
  11. Changing Attachments
  12. Refuelling
  13. On Completion
  14. Emergency Response
PDF Download
PDF File

You May Also Need

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View