null

Chain Trencher Safe Work Method Statement

Product SKU: 10045-7

Close up shot of a chain trencher
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Chain Trencher Safe Work Method Statement

This Chain Trencher Safe Work Method Statement (SWMS) covers hazards and controls with the view of ensuring that all reasonably practicable steps have been taken to prevent the likelihood of incident during the operation of a chain trencher associated with excavations.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work, Remotely &/or Isolated Work & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Chain Trencher SWMS:

  1. Working Outdoors
  2. Working Alone
  3. Transporting the Trencher
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Establish a Communication System with Ground Workers
  10. Trencher Operation
  11. Changing Attachments
  12. Refuelling
  13. On Completion
  14. Emergency Response
Write a Review
$89.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Chain Trencher Safe Work Method Statement

    This Chain Trencher Safe Work Method Statement (SWMS) covers hazards and controls with the view of ensuring that all reasonably practicable steps have been taken to prevent the likelihood of incident during the operation of a chain trencher associated with excavations.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Work in an area that may have a contaminated or flammable atmosphere
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

    Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work, Remotely &/or Isolated Work & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Chain Trencher SWMS:

    1. Working Outdoors
    2. Working Alone
    3. Transporting the Trencher
    4. Arrival On-site & Assess On-site Conditions
    5. Work Area Set-up
    6. Environment
    7. Housekeeping
    8. Manual Tasks
    9. Establish a Communication System with Ground Workers
    10. Trencher Operation
    11. Changing Attachments
    12. Refuelling
    13. On Completion
    14. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials

You may also need