Wishing You a Safe & Happy Holidays From SafetyDocs!
Please note, our team are on holiday from 5pm Mon 23rd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

New Electrical Regulations for QLD from 1 Jan 2025
Electrical installations in domestic roof spaces must be de-energised before work begins, or alternative controls implemented where this isn't practicable. To help you stay compliant, we’ve updated our Working in Roof Spaces SWMS to align with these new requirements. Learn more.

Person operating a concrete drill.

Concrete Core Drill Safe Operating Procedure

  • Instant Document Delivery via Email.
  • Add to your existing management system.
  • Can assist in ensuring workers are adequately trained.
  • Customisation instructions provided.
  • Microsoft Word Format (Fully editable).
  • Only pay once (no subscriptions required).

Concrete Core Drill Safe Operating Procedure (SOP)

The Concrete Core Drill Safe Operating Procedure (SOP) provides clear instructions for the safe and efficient use of concrete drill equipment.

Contents

  1. Hazards: Identifies potential hazards such as noise, electricity, and hazardous dust to mitigate dangers during operation.
  2. Pre-Operational Inspection: Detailed checklist so the drill is ready for safe use, including checks on emergency stops and drill bits.
  3. Precautions: Lists the necessary training and competencies required for operators to handle the equipment safely.
  4. Maintenance: Outlines the importance of following LOTO procedures and keeping a maintenance log for service records.
  5. Work Area: Measures to prepare the workspace by marking services and ensuring non-essential personnel are kept away.
  6. Operation Sequence: Step-by-step instructions to guide operators through safe and efficient drill use, from setup to shutdown.
  7. Changing Drill Bits: Instructions for safely changing drill bits to maintain operational efficiency.
  8. Manual Handling: Techniques to safely lift and transport equipment, reducing the risk of injury.
  9. On Completion: Steps to safely store and transport the drill after use so it's ready for the next job.
  10. Hazard Checklist: A comprehensive list to assess and manage risks associated with powered non-mobile plant equipment.

SOP Training Quiz

The Concrete Core Drill SOP includes a training quiz designed to reinforce learning and assess worker comprehension:

  • Interactive Learning: The quiz provides an engaging tool to test workers' understanding of the SOP.
  • Assessment Format: Featuring multiple-choice and true/false questions, the quiz evaluates knowledge effectively, with answers to facilitate learning.

Get the Concrete Core Drill Safe Operating Procedure today and prioritise safety in your operations.

  • Instant Document Delivery via Email.
  • Add to your existing management system.
  • Can assist in ensuring workers are adequately trained.
  • Customisation instructions provided.
  • Microsoft Word Format (Fully editable).
  • Only pay once (no subscriptions required).

Concrete Core Drill Safe Operating Procedure (SOP)

The Concrete Core Drill Safe Operating Procedure (SOP) provides clear instructions for the safe and efficient use of concrete drill equipment.

Contents

  1. Hazards: Identifies potential hazards such as noise, electricity, and hazardous dust to mitigate dangers during operation.
  2. Pre-Operational Inspection: Detailed checklist so the drill is ready for safe use, including checks on emergency stops and drill bits.
  3. Precautions: Lists the necessary training and competencies required for operators to handle the equipment safely.
  4. Maintenance: Outlines the importance of following LOTO procedures and keeping a maintenance log for service records.
  5. Work Area: Measures to prepare the workspace by marking services and ensuring non-essential personnel are kept away.
  6. Operation Sequence: Step-by-step instructions to guide operators through safe and efficient drill use, from setup to shutdown.
  7. Changing Drill Bits: Instructions for safely changing drill bits to maintain operational efficiency.
  8. Manual Handling: Techniques to safely lift and transport equipment, reducing the risk of injury.
  9. On Completion: Steps to safely store and transport the drill after use so it's ready for the next job.
  10. Hazard Checklist: A comprehensive list to assess and manage risks associated with powered non-mobile plant equipment.

SOP Training Quiz

The Concrete Core Drill SOP includes a training quiz designed to reinforce learning and assess worker comprehension:

  • Interactive Learning: The quiz provides an engaging tool to test workers' understanding of the SOP.
  • Assessment Format: Featuring multiple-choice and true/false questions, the quiz evaluates knowledge effectively, with answers to facilitate learning.

Get the Concrete Core Drill Safe Operating Procedure today and prioritise safety in your operations.

PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View