National Safe Work Month - Equip your team with essential workplace safety solutions this Safe Work Month with 25% off selected essential WHS documentation. Shop now. *T&C's apply. Discount is applied at cart.

Black vending machine with products on display inside vending machine

Vending Machine Installation and Restocking Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Vending Machine Installation and Restocking Safe Work Method Statement

This Vending Machine Installation and Restocking Safe Work Method Statement (SWMS) covers hazards and controls associated with the safe installation and maintenance of vending machines.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Vending Machine Installation and Restocking SWMS:

(includes potential hazards & control measures)

  1. Arrival On-site & Assess On-site Conditions
  2. Unloading & Transfer to the Installation Point
  3. Installation
  4. Maintenance &/or Restocking
  5. On Completion
  6. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Vending Machine Installation and Restocking Safe Work Method Statement

This Vending Machine Installation and Restocking Safe Work Method Statement (SWMS) covers hazards and controls associated with the safe installation and maintenance of vending machines.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Vending Machine Installation and Restocking SWMS:

(includes potential hazards & control measures)

  1. Arrival On-site & Assess On-site Conditions
  2. Unloading & Transfer to the Installation Point
  3. Installation
  4. Maintenance &/or Restocking
  5. On Completion
  6. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View