null

Switchboard Installation Safe Work Method Statement

Product SKU: 10504-3

man working on a switchboard
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Switchboard Installation Safe Work Method Statement

This Switchboard Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with installing switchboards, including hazards associated with energised electrical installations or services.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Asbestos disturbance
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Switchboard Installation SWMS:

(includes potential hazards and control measures)

  1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
  2. Obtain Supply Authority Certificates
  3. Working Outdoors
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Working with Powered & Non-powered Tools
  10. Hazardous Substance/Chemical Use
  11. Switchboard Installation
  12. Test & Commission, Confirm Phase Rotation of All 3-phase Equipment
  13. On Completion
  14. Emergency Response
Write a Review
$89.95
Custom branding available 76BAA198-9788-4A00-A3E8-BC847155F144
  • Personalise your documents with custom branding
  • Custom branding adds your business name, address, ABN and logo where required to the documents in your order
  • $9.95 per cart (no matter how many products are in your order)
  • Upload your details at cart
  • Receive your branded documents shortly after payment

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Switchboard Installation Safe Work Method Statement

    This Switchboard Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with installing switchboards, including hazards associated with energised electrical installations or services.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Asbestos disturbance
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Switchboard Installation SWMS:

    (includes potential hazards and control measures)

    1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
    2. Obtain Supply Authority Certificates
    3. Working Outdoors
    4. Arrival On-site & Assess On-site Conditions
    5. Work Area Set-up
    6. Environment
    7. Housekeeping
    8. Manual Tasks
    9. Working with Powered & Non-powered Tools
    10. Hazardous Substance/Chemical Use
    11. Switchboard Installation
    12. Test & Commission, Confirm Phase Rotation of All 3-phase Equipment
    13. On Completion
    14. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials