null

Smoke Alarm Testing - Installation Safe Work Method Statement

Product SKU: 10433-2

person testing a smoke alarm
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Smoke Alarm Testing - Installation Safe Work Method Statement

This Smoke Alarm Testing - Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with hard wired smoke alarm installation and alarm servicing.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Smoke Alarm Testing - Installation SWMS:

(includes potential hazards & control measures)

  1. Training
  2. Arrival On-site
  3. Work Area Set-up
  4. Locate & Isolate Existing Services
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Working with Powered & Non-powered Tools
  9. Working at Height on Ladders
  10. Working in Ceiling Spaces & Utility Areas
  11. Running Cables/Setting-up Equipment
  12. Mounting & Installing Components into Position
  13. Test & Commission
  14. Servicing/Maintenance/Testing
  15. On Completion
  16. Emergency Response
Write a Review
$89.95
Custom branding available

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Smoke Alarm Testing - Installation Safe Work Method Statement

    This Smoke Alarm Testing - Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with hard wired smoke alarm installation and alarm servicing.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Involves a risk of a person falling from 2m or more, including work on telecommunications towers
    • Work in an area that may have a contaminated or flammable atmosphere

    Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

    FREE Legislation & Codes of Practice Reference List

    Job Steps Covered in Smoke Alarm Testing - Installation SWMS:

    (includes potential hazards & control measures)

    1. Training
    2. Arrival On-site
    3. Work Area Set-up
    4. Locate & Isolate Existing Services
    5. Environment
    6. Housekeeping
    7. Manual Tasks
    8. Working with Powered & Non-powered Tools
    9. Working at Height on Ladders
    10. Working in Ceiling Spaces & Utility Areas
    11. Running Cables/Setting-up Equipment
    12. Mounting & Installing Components into Position
    13. Test & Commission
    14. Servicing/Maintenance/Testing
    15. On Completion
    16. Emergency Response
  • Document Sample
  • PDF Download
    PDF File
  • Tutorials